|
|
|
|
LEADER |
00962cam a2200241 i 4500 |
001 |
0000149349 |
005 |
20250714090000.0 |
008 |
241125 20202020my |
040 |
|
|
|a KPM
|b eng
|c KPM
|e rda
|
090 |
0 |
0 |
|a 690
|b MOH
|c f
|d TH
|e 2020
|
100 |
1 |
|
|a MOHD SAFRI BIN MAT JAYA
|e author
|
245 |
1 |
0 |
|a COST OVERRUN IN MALAYSIAN ARMED FORCES CONSTRUSCTION PROJECTS
|c MOHD SAFRI BIN MAT JAYA
|
264 |
|
1 |
|a SHAH ALAM
|b UNIVERSITI TEKNOLOGI MARA
|c 2020
|
300 |
|
|
|a xiii, 140 pages :
|b colour illustrations ;
|c 30 cm
|
336 |
|
|
|a text
|2 rdacontent
|
337 |
|
|
|a unmediated
|2 rdamedia
|
338 |
|
|
|a volume
|2 rdacarrier
|
504 |
|
|
|a Includes bibliographical references
|
650 |
|
0 |
|a Project cost management
|x Risk management in construction
|
650 |
|
0 |
|a Construction project management
|x Cost estimation
|
650 |
|
0 |
|a Cost control
|x Engineering project risk analysis
|
852 |
|
|
|a 01
|
999 |
|
|
|a TH0027280
|b KEMENTAH
|d THESIS
|e Thesis
|f Perpustakaan KEMENTAH
|j AVAILABLE
|p 1
|q GOOD CONDITION
|