The successful implementation of TPM in conjunction with EOM and 5S: a case presentation

Certainly, manufacturing plants are encountering resource constraints. Limited equipment resources require close attention to make them useful every moment. This demands a total participatory equipment maintenance environment. Total Productive Maintenance (TPM) philosophy demonstrates that potential...

Full description

Bibliographic Details
Main Authors: Ahmed, Shamsuddin, Mohiuddin, A. K. M.
Format: Article
Language:English
Published: Asian Network for Scientific Information 2005
Subjects:
Online Access:http://irep.iium.edu.my/1219/
http://irep.iium.edu.my/1219/
http://irep.iium.edu.my/1219/1/JAS-2.pdf
id iium-1219
recordtype eprints
spelling iium-12192011-08-15T02:41:13Z http://irep.iium.edu.my/1219/ The successful implementation of TPM in conjunction with EOM and 5S: a case presentation Ahmed, Shamsuddin Mohiuddin, A. K. M. T55.4 Industrial engineering.Management engineering. Certainly, manufacturing plants are encountering resource constraints. Limited equipment resources require close attention to make them useful every moment. This demands a total participatory equipment maintenance environment. Total Productive Maintenance (TPM) philosophy demonstrates that potential ability. In conjunction with Ecology Oriented Management (EOM)and Japaneses 5Ss housekeeping-norms, TPM can offer the successful achievement of total maintenance and pertinent productive goals. This study presents a case example on how a blend of these three concepts renders the highest effective potential in maintenance arena that can excel over maintenance goals. The methodology of this study is two fold: literature survey and case investigations in a large-scale company. Asian Network for Scientific Information 2005 Article PeerReviewed application/pdf en http://irep.iium.edu.my/1219/1/JAS-2.pdf Ahmed, Shamsuddin and Mohiuddin, A. K. M. (2005) The successful implementation of TPM in conjunction with EOM and 5S: a case presentation. Journal of Applied Sciences, 5 (5). pp. 938-951. ISSN 1812-5662 (O), 1812-5654 (P) http://scialert.net/abstract/?doi=jas.2005.938.951
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
topic T55.4 Industrial engineering.Management engineering.
spellingShingle T55.4 Industrial engineering.Management engineering.
Ahmed, Shamsuddin
Mohiuddin, A. K. M.
The successful implementation of TPM in conjunction with EOM and 5S: a case presentation
description Certainly, manufacturing plants are encountering resource constraints. Limited equipment resources require close attention to make them useful every moment. This demands a total participatory equipment maintenance environment. Total Productive Maintenance (TPM) philosophy demonstrates that potential ability. In conjunction with Ecology Oriented Management (EOM)and Japaneses 5Ss housekeeping-norms, TPM can offer the successful achievement of total maintenance and pertinent productive goals. This study presents a case example on how a blend of these three concepts renders the highest effective potential in maintenance arena that can excel over maintenance goals. The methodology of this study is two fold: literature survey and case investigations in a large-scale company.
format Article
author Ahmed, Shamsuddin
Mohiuddin, A. K. M.
author_facet Ahmed, Shamsuddin
Mohiuddin, A. K. M.
author_sort Ahmed, Shamsuddin
title The successful implementation of TPM in conjunction with EOM and 5S: a case presentation
title_short The successful implementation of TPM in conjunction with EOM and 5S: a case presentation
title_full The successful implementation of TPM in conjunction with EOM and 5S: a case presentation
title_fullStr The successful implementation of TPM in conjunction with EOM and 5S: a case presentation
title_full_unstemmed The successful implementation of TPM in conjunction with EOM and 5S: a case presentation
title_sort successful implementation of tpm in conjunction with eom and 5s: a case presentation
publisher Asian Network for Scientific Information
publishDate 2005
url http://irep.iium.edu.my/1219/
http://irep.iium.edu.my/1219/
http://irep.iium.edu.my/1219/1/JAS-2.pdf
first_indexed 2023-09-18T20:08:26Z
last_indexed 2023-09-18T20:08:26Z
_version_ 1777407315021922304