The successful implementation of TPM in conjunction with EOM and 5S: a case presentation
Certainly, manufacturing plants are encountering resource constraints. Limited equipment resources require close attention to make them useful every moment. This demands a total participatory equipment maintenance environment. Total Productive Maintenance (TPM) philosophy demonstrates that potential...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Asian Network for Scientific Information
2005
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/1219/ http://irep.iium.edu.my/1219/ http://irep.iium.edu.my/1219/1/JAS-2.pdf |
id |
iium-1219 |
---|---|
recordtype |
eprints |
spelling |
iium-12192011-08-15T02:41:13Z http://irep.iium.edu.my/1219/ The successful implementation of TPM in conjunction with EOM and 5S: a case presentation Ahmed, Shamsuddin Mohiuddin, A. K. M. T55.4 Industrial engineering.Management engineering. Certainly, manufacturing plants are encountering resource constraints. Limited equipment resources require close attention to make them useful every moment. This demands a total participatory equipment maintenance environment. Total Productive Maintenance (TPM) philosophy demonstrates that potential ability. In conjunction with Ecology Oriented Management (EOM)and Japaneses 5Ss housekeeping-norms, TPM can offer the successful achievement of total maintenance and pertinent productive goals. This study presents a case example on how a blend of these three concepts renders the highest effective potential in maintenance arena that can excel over maintenance goals. The methodology of this study is two fold: literature survey and case investigations in a large-scale company. Asian Network for Scientific Information 2005 Article PeerReviewed application/pdf en http://irep.iium.edu.my/1219/1/JAS-2.pdf Ahmed, Shamsuddin and Mohiuddin, A. K. M. (2005) The successful implementation of TPM in conjunction with EOM and 5S: a case presentation. Journal of Applied Sciences, 5 (5). pp. 938-951. ISSN 1812-5662 (O), 1812-5654 (P) http://scialert.net/abstract/?doi=jas.2005.938.951 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
International Islamic University Malaysia |
building |
IIUM Repository |
collection |
Online Access |
language |
English |
topic |
T55.4 Industrial engineering.Management engineering. |
spellingShingle |
T55.4 Industrial engineering.Management engineering. Ahmed, Shamsuddin Mohiuddin, A. K. M. The successful implementation of TPM in conjunction with EOM and 5S: a case presentation |
description |
Certainly, manufacturing plants are encountering resource constraints. Limited equipment resources require close attention to make them useful every moment. This demands a total participatory equipment maintenance environment. Total Productive Maintenance (TPM) philosophy demonstrates that potential ability. In conjunction with Ecology Oriented Management (EOM)and Japaneses 5Ss housekeeping-norms, TPM can offer the successful achievement of total maintenance and pertinent productive goals. This study presents a case example on how a blend of these three concepts renders the highest effective potential in maintenance arena that can excel over maintenance goals. The methodology of this study is two fold: literature survey and case investigations in a large-scale company. |
format |
Article |
author |
Ahmed, Shamsuddin Mohiuddin, A. K. M. |
author_facet |
Ahmed, Shamsuddin Mohiuddin, A. K. M. |
author_sort |
Ahmed, Shamsuddin |
title |
The successful implementation of TPM in conjunction with EOM and 5S: a case presentation |
title_short |
The successful implementation of TPM in conjunction with EOM and 5S: a case presentation |
title_full |
The successful implementation of TPM in conjunction with EOM and 5S: a case presentation |
title_fullStr |
The successful implementation of TPM in conjunction with EOM and 5S: a case presentation |
title_full_unstemmed |
The successful implementation of TPM in conjunction with EOM and 5S: a case presentation |
title_sort |
successful implementation of tpm in conjunction with eom and 5s: a case presentation |
publisher |
Asian Network for Scientific Information |
publishDate |
2005 |
url |
http://irep.iium.edu.my/1219/ http://irep.iium.edu.my/1219/ http://irep.iium.edu.my/1219/1/JAS-2.pdf |
first_indexed |
2023-09-18T20:08:26Z |
last_indexed |
2023-09-18T20:08:26Z |
_version_ |
1777407315021922304 |