The study on production performances of part transporter in flexible manufacturing system by using simulation method

Material handling is one of major components in Flexible Manufacturing System (FMS). Any improvement of material handling capability is to affect the performance of the whole system. This paper discusses the simulation study on the effect of part arrival rate and dispatching rules to the average...

Full description

Bibliographic Details
Main Authors: Iqbal, Mohammad, Purnomo, Muhammad Ridwan Andi, Mohd Imra, Muhammad Ammar, Konneh, Mohamed, Karim, A.N. Mustafizul
Format: Article
Language:English
Published: Trans Tech Publications, Switzerland 2012
Subjects:
Online Access:http://irep.iium.edu.my/26755/
http://irep.iium.edu.my/26755/
http://irep.iium.edu.my/26755/
http://irep.iium.edu.my/26755/1/AMR_FMS%2324.pdf
id iium-26755
recordtype eprints
spelling iium-267552012-11-21T05:17:09Z http://irep.iium.edu.my/26755/ The study on production performances of part transporter in flexible manufacturing system by using simulation method Iqbal, Mohammad Purnomo, Muhammad Ridwan Andi Mohd Imra, Muhammad Ammar Konneh, Mohamed Karim, A.N. Mustafizul T55.4 Industrial engineering.Management engineering. Material handling is one of major components in Flexible Manufacturing System (FMS). Any improvement of material handling capability is to affect the performance of the whole system. This paper discusses the simulation study on the effect of part arrival rate and dispatching rules to the average waiting time and production rate of the FMS. The facilities of the system were modeled into simulation environment by using Arena Simulation Software. The production parameters such as machine processing times, part transportation speed and type of products were put into the model to represent the behaviors of the real system. Two rules have been considered in the study, i. e. first come first served (FCFS), and shortest processing time (SPT). Average waiting time and productivity were taken into account as performance measures of the system. The result of the study showed that SPT rule gives shorter average waiting time and higher productivity. Based on this result, the SPT rules would be used to control part transporter in order to have a better performance of the FMS. Trans Tech Publications, Switzerland 2012-10-08 Article PeerReviewed application/pdf en http://irep.iium.edu.my/26755/1/AMR_FMS%2324.pdf Iqbal, Mohammad and Purnomo, Muhammad Ridwan Andi and Mohd Imra, Muhammad Ammar and Konneh, Mohamed and Karim, A.N. Mustafizul (2012) The study on production performances of part transporter in flexible manufacturing system by using simulation method. Advanced Materials Research, 576. pp. 714-717. ISSN 1022-6680 http://www.scientific.net/AMR.576.714 10.4028/www.scientific.net/AMR.576.714
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
topic T55.4 Industrial engineering.Management engineering.
spellingShingle T55.4 Industrial engineering.Management engineering.
Iqbal, Mohammad
Purnomo, Muhammad Ridwan Andi
Mohd Imra, Muhammad Ammar
Konneh, Mohamed
Karim, A.N. Mustafizul
The study on production performances of part transporter in flexible manufacturing system by using simulation method
description Material handling is one of major components in Flexible Manufacturing System (FMS). Any improvement of material handling capability is to affect the performance of the whole system. This paper discusses the simulation study on the effect of part arrival rate and dispatching rules to the average waiting time and production rate of the FMS. The facilities of the system were modeled into simulation environment by using Arena Simulation Software. The production parameters such as machine processing times, part transportation speed and type of products were put into the model to represent the behaviors of the real system. Two rules have been considered in the study, i. e. first come first served (FCFS), and shortest processing time (SPT). Average waiting time and productivity were taken into account as performance measures of the system. The result of the study showed that SPT rule gives shorter average waiting time and higher productivity. Based on this result, the SPT rules would be used to control part transporter in order to have a better performance of the FMS.
format Article
author Iqbal, Mohammad
Purnomo, Muhammad Ridwan Andi
Mohd Imra, Muhammad Ammar
Konneh, Mohamed
Karim, A.N. Mustafizul
author_facet Iqbal, Mohammad
Purnomo, Muhammad Ridwan Andi
Mohd Imra, Muhammad Ammar
Konneh, Mohamed
Karim, A.N. Mustafizul
author_sort Iqbal, Mohammad
title The study on production performances of part transporter in flexible manufacturing system by using simulation method
title_short The study on production performances of part transporter in flexible manufacturing system by using simulation method
title_full The study on production performances of part transporter in flexible manufacturing system by using simulation method
title_fullStr The study on production performances of part transporter in flexible manufacturing system by using simulation method
title_full_unstemmed The study on production performances of part transporter in flexible manufacturing system by using simulation method
title_sort study on production performances of part transporter in flexible manufacturing system by using simulation method
publisher Trans Tech Publications, Switzerland
publishDate 2012
url http://irep.iium.edu.my/26755/
http://irep.iium.edu.my/26755/
http://irep.iium.edu.my/26755/
http://irep.iium.edu.my/26755/1/AMR_FMS%2324.pdf
first_indexed 2023-09-18T20:39:49Z
last_indexed 2023-09-18T20:39:49Z
_version_ 1777409289878503424