The study on production performances of part transporter in flexible manufacturing system by using simulation method
Material handling is one of major components in Flexible Manufacturing System (FMS). Any improvement of material handling capability is to affect the performance of the whole system. This paper discusses the simulation study on the effect of part arrival rate and dispatching rules to the average...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Trans Tech Publications, Switzerland
2012
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/26755/ http://irep.iium.edu.my/26755/ http://irep.iium.edu.my/26755/ http://irep.iium.edu.my/26755/1/AMR_FMS%2324.pdf |
id |
iium-26755 |
---|---|
recordtype |
eprints |
spelling |
iium-267552012-11-21T05:17:09Z http://irep.iium.edu.my/26755/ The study on production performances of part transporter in flexible manufacturing system by using simulation method Iqbal, Mohammad Purnomo, Muhammad Ridwan Andi Mohd Imra, Muhammad Ammar Konneh, Mohamed Karim, A.N. Mustafizul T55.4 Industrial engineering.Management engineering. Material handling is one of major components in Flexible Manufacturing System (FMS). Any improvement of material handling capability is to affect the performance of the whole system. This paper discusses the simulation study on the effect of part arrival rate and dispatching rules to the average waiting time and production rate of the FMS. The facilities of the system were modeled into simulation environment by using Arena Simulation Software. The production parameters such as machine processing times, part transportation speed and type of products were put into the model to represent the behaviors of the real system. Two rules have been considered in the study, i. e. first come first served (FCFS), and shortest processing time (SPT). Average waiting time and productivity were taken into account as performance measures of the system. The result of the study showed that SPT rule gives shorter average waiting time and higher productivity. Based on this result, the SPT rules would be used to control part transporter in order to have a better performance of the FMS. Trans Tech Publications, Switzerland 2012-10-08 Article PeerReviewed application/pdf en http://irep.iium.edu.my/26755/1/AMR_FMS%2324.pdf Iqbal, Mohammad and Purnomo, Muhammad Ridwan Andi and Mohd Imra, Muhammad Ammar and Konneh, Mohamed and Karim, A.N. Mustafizul (2012) The study on production performances of part transporter in flexible manufacturing system by using simulation method. Advanced Materials Research, 576. pp. 714-717. ISSN 1022-6680 http://www.scientific.net/AMR.576.714 10.4028/www.scientific.net/AMR.576.714 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
International Islamic University Malaysia |
building |
IIUM Repository |
collection |
Online Access |
language |
English |
topic |
T55.4 Industrial engineering.Management engineering. |
spellingShingle |
T55.4 Industrial engineering.Management engineering. Iqbal, Mohammad Purnomo, Muhammad Ridwan Andi Mohd Imra, Muhammad Ammar Konneh, Mohamed Karim, A.N. Mustafizul The study on production performances of part transporter in flexible manufacturing system by using simulation method |
description |
Material handling is one of major components in Flexible Manufacturing System (FMS).
Any improvement of material handling capability is to affect the performance of the whole system.
This paper discusses the simulation study on the effect of part arrival rate and dispatching rules to
the average waiting time and production rate of the FMS. The facilities of the system were modeled
into simulation environment by using Arena Simulation Software. The production parameters such
as machine processing times, part transportation speed and type of products were put into the model
to represent the behaviors of the real system. Two rules have been considered in the study, i. e. first
come first served (FCFS), and shortest processing time (SPT). Average waiting time and productivity were taken into account as performance measures of the system. The result of the study showed that SPT rule gives shorter average waiting time and higher productivity. Based on this
result, the SPT rules would be used to control part transporter in order to have a better performance
of the FMS. |
format |
Article |
author |
Iqbal, Mohammad Purnomo, Muhammad Ridwan Andi Mohd Imra, Muhammad Ammar Konneh, Mohamed Karim, A.N. Mustafizul |
author_facet |
Iqbal, Mohammad Purnomo, Muhammad Ridwan Andi Mohd Imra, Muhammad Ammar Konneh, Mohamed Karim, A.N. Mustafizul |
author_sort |
Iqbal, Mohammad |
title |
The study on production performances of part transporter in flexible manufacturing system by using simulation method |
title_short |
The study on production performances of part transporter in flexible manufacturing system by using simulation method |
title_full |
The study on production performances of part transporter in flexible manufacturing system by using simulation method |
title_fullStr |
The study on production performances of part transporter in flexible manufacturing system by using simulation method |
title_full_unstemmed |
The study on production performances of part transporter in flexible manufacturing system by using simulation method |
title_sort |
study on production performances of part transporter in flexible manufacturing system by using simulation method |
publisher |
Trans Tech Publications, Switzerland |
publishDate |
2012 |
url |
http://irep.iium.edu.my/26755/ http://irep.iium.edu.my/26755/ http://irep.iium.edu.my/26755/ http://irep.iium.edu.my/26755/1/AMR_FMS%2324.pdf |
first_indexed |
2023-09-18T20:39:49Z |
last_indexed |
2023-09-18T20:39:49Z |
_version_ |
1777409289878503424 |