Constraints in implementing public private partnership (PPP) in Malaysia

Purpose(s): There are two objectives of this present study. First, it intends to scrutinize the challenges in implementing PPP by examining the factors that hinder the successful adoption of PPP in Malaysia. Second, it aims to investigate the differences in the perceptions of the Government and the...

Full description

Bibliographic Details
Main Authors: Ismail, Suhaiza, Haris, Fatimah Azzahra
Format: Article
Language:English
Published: Emerald Group Publishing Limited 2014
Subjects:
Online Access:http://irep.iium.edu.my/37223/
http://irep.iium.edu.my/37223/
http://irep.iium.edu.my/37223/1/BEPAMVOl4Issue3.pdf
id iium-37223
recordtype eprints
spelling iium-372232014-07-07T06:16:27Z http://irep.iium.edu.my/37223/ Constraints in implementing public private partnership (PPP) in Malaysia Ismail, Suhaiza Haris, Fatimah Azzahra H96 Public policy (General), Policy sciences Purpose(s): There are two objectives of this present study. First, it intends to scrutinize the challenges in implementing PPP by examining the factors that hinder the successful adoption of PPP in Malaysia. Second, it aims to investigate the differences in the perceptions of the Government and the private sector pertaining to the hindrance factors. Methodology: A questionnaire survey was used to elicit the perceptions of the public and private sectors concerning the constraints of PPP implementation in Malaysia. A total of 122 usable responses were obtained. The mean score and mean score ranking were used to examine the importance of the hindrance factors. An independent sample t-test was used to examine the differences in the perceptions between the two sectors. Findings: The overall results show that ‘lengthy delays in negotiation’, ‘lack of government guidelines and procedures on PPP’, ‘higher charge to direct users’, ‘lengthy delays because of political debate’ and ‘confusion over government objectives and evaluation criteria’ are the top five constraints for adopting PPP in Malaysia. In terms of the differences in the perceptions between the public and private sector groups, the statistical test results indicate that there are only significant differences in the perceptions for two hindrance factors. Originality/value: The paper contributes to the existing literature on PPP, which is currently limited, by focusing on the challenges of implementing PPP in a developing country. More importantly, this paper provides evidence concerning the differences in the opinion of two key players (i.e. the Government and the private sector) on the PPP hindrance factors. Keywords: Public Private Partnerships (PPP), constraints, negative factors, hindrance factors, Malaysia Emerald Group Publishing Limited 2014 Article PeerReviewed application/pdf en http://irep.iium.edu.my/37223/1/BEPAMVOl4Issue3.pdf Ismail, Suhaiza and Haris, Fatimah Azzahra (2014) Constraints in implementing public private partnership (PPP) in Malaysia. Built Environment Project and Asset Management, 4 (3). pp. 238-250. ISSN 2044-124X 10.1108/BEPAM-10-2013-0049
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
topic H96 Public policy (General), Policy sciences
spellingShingle H96 Public policy (General), Policy sciences
Ismail, Suhaiza
Haris, Fatimah Azzahra
Constraints in implementing public private partnership (PPP) in Malaysia
description Purpose(s): There are two objectives of this present study. First, it intends to scrutinize the challenges in implementing PPP by examining the factors that hinder the successful adoption of PPP in Malaysia. Second, it aims to investigate the differences in the perceptions of the Government and the private sector pertaining to the hindrance factors. Methodology: A questionnaire survey was used to elicit the perceptions of the public and private sectors concerning the constraints of PPP implementation in Malaysia. A total of 122 usable responses were obtained. The mean score and mean score ranking were used to examine the importance of the hindrance factors. An independent sample t-test was used to examine the differences in the perceptions between the two sectors. Findings: The overall results show that ‘lengthy delays in negotiation’, ‘lack of government guidelines and procedures on PPP’, ‘higher charge to direct users’, ‘lengthy delays because of political debate’ and ‘confusion over government objectives and evaluation criteria’ are the top five constraints for adopting PPP in Malaysia. In terms of the differences in the perceptions between the public and private sector groups, the statistical test results indicate that there are only significant differences in the perceptions for two hindrance factors. Originality/value: The paper contributes to the existing literature on PPP, which is currently limited, by focusing on the challenges of implementing PPP in a developing country. More importantly, this paper provides evidence concerning the differences in the opinion of two key players (i.e. the Government and the private sector) on the PPP hindrance factors. Keywords: Public Private Partnerships (PPP), constraints, negative factors, hindrance factors, Malaysia
format Article
author Ismail, Suhaiza
Haris, Fatimah Azzahra
author_facet Ismail, Suhaiza
Haris, Fatimah Azzahra
author_sort Ismail, Suhaiza
title Constraints in implementing public private partnership (PPP) in Malaysia
title_short Constraints in implementing public private partnership (PPP) in Malaysia
title_full Constraints in implementing public private partnership (PPP) in Malaysia
title_fullStr Constraints in implementing public private partnership (PPP) in Malaysia
title_full_unstemmed Constraints in implementing public private partnership (PPP) in Malaysia
title_sort constraints in implementing public private partnership (ppp) in malaysia
publisher Emerald Group Publishing Limited
publishDate 2014
url http://irep.iium.edu.my/37223/
http://irep.iium.edu.my/37223/
http://irep.iium.edu.my/37223/1/BEPAMVOl4Issue3.pdf
first_indexed 2023-09-18T20:53:23Z
last_indexed 2023-09-18T20:53:23Z
_version_ 1777410143649005568