Scenario Management and Requirements Tool (SMaRT)
The aim of this project is to develop a Scenario Management and Requirements Tool (SMaRT) to assist users involved in managing the Requirements Engineering (RE) process. The existing RE tools did not support or had less focus on scenario-based methodology, or missing some important RE features. SMaR...
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English English |
Published: |
2014
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/40824/ http://irep.iium.edu.my/40824/2/SMaRT_Poster_7_-_IRIIE14.pdf http://irep.iium.edu.my/40824/6/Scenario_Management_and_Requirements_Tool.pdf |
Summary: | The aim of this project is to develop a Scenario Management and Requirements Tool (SMaRT) to assist users involved in managing the Requirements Engineering (RE) process. The existing RE tools did not support or had less focus on scenario-based methodology, or missing some important RE features. SMaRT improves existing RE tool features to further support scenario-based RE methodology and to cover relevant RE processes i.e. analysis and negotiation, documentation, validation, and management.
* Kotonya, G. , & Sommervile, I. (2003). Requirements engineering: Processes and techniques. John Wiley.
|
---|