Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences

The strategic planning of International Islamic University Malaysia (IIUM) promotes the establishment of a teaching hospital for the clinical and practice of medicine. The journey towards the fruition of the hospital from before 2009 to 2016 (7 years) has been a learning path for both experienced an...

Full description

Bibliographic Details
Main Authors: Mohd Nawawi, Norwina, Sapian, Abdul Razak, Zulkifly, Ahmad Hafiz
Format: Conference or Workshop Item
Language:English
English
English
Published: 2017
Subjects:
Online Access:http://irep.iium.edu.my/57516/
http://irep.iium.edu.my/57516/1/IIUMTeaching%20HospExp-JKR2017-R.pdf
http://irep.iium.edu.my/57516/2/Surat%20Jemputan%20Penceramah%20YBhg.%20Datin%20Hjh.%20Assoc.%20Prof.%20Ar.%20Dr.%20Norwina%20Binti%20Mohd.%20Nawawi.pdf
http://irep.iium.edu.my/57516/3/Aturcara%20Program%20Seminar%20%27Lessons%20Learned%27%20Projek%20Fasiliti%20Kesihatan%20dan%20Hospital.pdf
id iium-57516
recordtype eprints
spelling iium-575162017-07-07T07:41:10Z http://irep.iium.edu.my/57516/ Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences Mohd Nawawi, Norwina Sapian, Abdul Razak Zulkifly, Ahmad Hafiz NA Architecture NA4170 Public buildings R Medicine (General) TH5011 Construction by phase of work (Building trades). The strategic planning of International Islamic University Malaysia (IIUM) promotes the establishment of a teaching hospital for the clinical and practice of medicine. The journey towards the fruition of the hospital from before 2009 to 2016 (7 years) has been a learning path for both experienced and non-experience d professionals on the job. Being the 2nd purpose built teaching hospital after University of Malaya Medical Centre (UMMC) in Malaysia, the project has no precedent. The government decides that IIUM Hospital is to be procured through Public Private Partnership (PPP) mode and built on the basis of Shariah Compliant construction. IIUM established as a company thus tendered the hospital as “private healthcare facility” and therefore require to comply to Healthcare Facilities and Services Act 1998 were among the predicament for this project. This presentation intent to provide, very briefly, lessons learns from the inception of the project , through the formulation of the brief, the negotiation with the governing bodies, through the design development, construction and commissioning with the concessionaire, as a complete cycle. Qualitatively, as part of the User-client team, through hands-on-experience and available documentations on the job , the presentation informed steps taken at each stage with the rationale to learn or unlearn from the decisions made in an open discussion. With the limitation of time as well as inflicted with confidential material , although the hospital is yet to be fully operational, knowledge gained from this simple transaction of discussion is never too early to be shared and improved for the better. 2017 Conference or Workshop Item NonPeerReviewed application/pdf en http://irep.iium.edu.my/57516/1/IIUMTeaching%20HospExp-JKR2017-R.pdf application/pdf en http://irep.iium.edu.my/57516/2/Surat%20Jemputan%20Penceramah%20YBhg.%20Datin%20Hjh.%20Assoc.%20Prof.%20Ar.%20Dr.%20Norwina%20Binti%20Mohd.%20Nawawi.pdf application/pdf en http://irep.iium.edu.my/57516/3/Aturcara%20Program%20Seminar%20%27Lessons%20Learned%27%20Projek%20Fasiliti%20Kesihatan%20dan%20Hospital.pdf Mohd Nawawi, Norwina and Sapian, Abdul Razak and Zulkifly, Ahmad Hafiz (2017) Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences. In: Seminar ‘ Lessons Learnt’ : Projek Fasiliti Kesihatan & Hospital, 7 June 2017, Alor Gajah, Melaka, Malaysia. (Unpublished)
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
English
English
topic NA Architecture
NA4170 Public buildings
R Medicine (General)
TH5011 Construction by phase of work (Building trades).
spellingShingle NA Architecture
NA4170 Public buildings
R Medicine (General)
TH5011 Construction by phase of work (Building trades).
Mohd Nawawi, Norwina
Sapian, Abdul Razak
Zulkifly, Ahmad Hafiz
Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences
description The strategic planning of International Islamic University Malaysia (IIUM) promotes the establishment of a teaching hospital for the clinical and practice of medicine. The journey towards the fruition of the hospital from before 2009 to 2016 (7 years) has been a learning path for both experienced and non-experience d professionals on the job. Being the 2nd purpose built teaching hospital after University of Malaya Medical Centre (UMMC) in Malaysia, the project has no precedent. The government decides that IIUM Hospital is to be procured through Public Private Partnership (PPP) mode and built on the basis of Shariah Compliant construction. IIUM established as a company thus tendered the hospital as “private healthcare facility” and therefore require to comply to Healthcare Facilities and Services Act 1998 were among the predicament for this project. This presentation intent to provide, very briefly, lessons learns from the inception of the project , through the formulation of the brief, the negotiation with the governing bodies, through the design development, construction and commissioning with the concessionaire, as a complete cycle. Qualitatively, as part of the User-client team, through hands-on-experience and available documentations on the job , the presentation informed steps taken at each stage with the rationale to learn or unlearn from the decisions made in an open discussion. With the limitation of time as well as inflicted with confidential material , although the hospital is yet to be fully operational, knowledge gained from this simple transaction of discussion is never too early to be shared and improved for the better.
format Conference or Workshop Item
author Mohd Nawawi, Norwina
Sapian, Abdul Razak
Zulkifly, Ahmad Hafiz
author_facet Mohd Nawawi, Norwina
Sapian, Abdul Razak
Zulkifly, Ahmad Hafiz
author_sort Mohd Nawawi, Norwina
title Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences
title_short Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences
title_full Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences
title_fullStr Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences
title_full_unstemmed Retrospect hospital project development from briefing to completion: Case study of IIUM Teaching Hospital experiences
title_sort retrospect hospital project development from briefing to completion: case study of iium teaching hospital experiences
publishDate 2017
url http://irep.iium.edu.my/57516/
http://irep.iium.edu.my/57516/1/IIUMTeaching%20HospExp-JKR2017-R.pdf
http://irep.iium.edu.my/57516/2/Surat%20Jemputan%20Penceramah%20YBhg.%20Datin%20Hjh.%20Assoc.%20Prof.%20Ar.%20Dr.%20Norwina%20Binti%20Mohd.%20Nawawi.pdf
http://irep.iium.edu.my/57516/3/Aturcara%20Program%20Seminar%20%27Lessons%20Learned%27%20Projek%20Fasiliti%20Kesihatan%20dan%20Hospital.pdf
first_indexed 2023-09-18T21:21:18Z
last_indexed 2023-09-18T21:21:18Z
_version_ 1777411900306358272