Techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of Pakistan
Pakistan is a developing country. The population of Pakistan is increasing day by day and due to increase in population the demand of electrical energy is also rising. Currently, Pakistan has a power generation gap of average 4500 to 5500 megawatt hour (MWh) [1]. The Renewable energy plays a vital r...
| Main Authors: | Manzoor, Zahid, Shahid, Zeeshan, Khan, Sheroz, Hwang, John Tan Teng |
|---|---|
| Format: | Conference or Workshop Item |
| Language: | English English |
| Published: |
Institute of Electrical and Electronics Engineers Inc.
2018
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/72881/ http://irep.iium.edu.my/72881/ http://irep.iium.edu.my/72881/ http://irep.iium.edu.my/72881/7/72881_Techno-commercial%20feasibility%20of%20grid-tied_complete_new.pdf http://irep.iium.edu.my/72881/1/72881_Techno-commercial%20feasibility%20of%20grid-tied_scopus.pdf |
Similar Items
-
Investigation on grid synchronization for grid-tied DC-AC single phase inverters
by: Shahid, Zeeshan, et al.
Published: (2014) -
DC-DC boost converter for grid-tied renewable energy generation systems
by: Shahid, Zeeshan, et al.
Published: (2014) -
Techno-economic analysis of 1 MWp grid connected solar PV plant in Malaysia
by: Kumar, Nallapaneni Manoj, et al.
Published: (2017) -
Study on structure defect in commercial building in Malaysia
by: Che Nurwani, Che Soh
Published: (2018) -
Target Strength Identification Using Commercial Echo Sounder
by: Sunardi, S., et al.
Published: (2014)