Life cycle cost (beginning) to procurement managers

Appointed as A Speaker/Trainer by Public Works Department to provide one day training/lecture to Procurement Managers from all around Malaysia under Pensijilan Ukur Bahan -Pengurus Perolehan (Tahap 3): Program Latihan Jabatan Kerja Raya Malaysia 2019.

Bibliographic Details
Main Author: Ayob, Mohd Fairullazi
Format: Conference or Workshop Item
Language:English
English
Published: 2019
Subjects:
Online Access:http://irep.iium.edu.my/74171/
http://irep.iium.edu.my/74171/18/74171%20invitation%20letter.pdf
http://irep.iium.edu.my/74171/1/JKR-LCC%20BEGINNING-PART%201%2031072019.pdf
id iium-74171
recordtype eprints
spelling iium-741712019-09-20T04:07:30Z http://irep.iium.edu.my/74171/ Life cycle cost (beginning) to procurement managers Ayob, Mohd Fairullazi T55.4 Industrial engineering.Management engineering. TA177.4 Engineering economy TA190 Management of engineering works TH Building construction Appointed as A Speaker/Trainer by Public Works Department to provide one day training/lecture to Procurement Managers from all around Malaysia under Pensijilan Ukur Bahan -Pengurus Perolehan (Tahap 3): Program Latihan Jabatan Kerja Raya Malaysia 2019. 2019-08 Conference or Workshop Item NonPeerReviewed application/pdf en http://irep.iium.edu.my/74171/18/74171%20invitation%20letter.pdf application/pdf en http://irep.iium.edu.my/74171/1/JKR-LCC%20BEGINNING-PART%201%2031072019.pdf Ayob, Mohd Fairullazi (2019) Life cycle cost (beginning) to procurement managers. In: Program Latihan Jabatan Kerja Raya Malaysia 2019 : Pensijilan Ukur Bahan -Pengurus Perolehan (Tahap 3), 5th- 8th August 2019, Alor Gajah, Melaka.. (Unpublished)
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
English
topic T55.4 Industrial engineering.Management engineering.
TA177.4 Engineering economy
TA190 Management of engineering works
TH Building construction
spellingShingle T55.4 Industrial engineering.Management engineering.
TA177.4 Engineering economy
TA190 Management of engineering works
TH Building construction
Ayob, Mohd Fairullazi
Life cycle cost (beginning) to procurement managers
description Appointed as A Speaker/Trainer by Public Works Department to provide one day training/lecture to Procurement Managers from all around Malaysia under Pensijilan Ukur Bahan -Pengurus Perolehan (Tahap 3): Program Latihan Jabatan Kerja Raya Malaysia 2019.
format Conference or Workshop Item
author Ayob, Mohd Fairullazi
author_facet Ayob, Mohd Fairullazi
author_sort Ayob, Mohd Fairullazi
title Life cycle cost (beginning) to procurement managers
title_short Life cycle cost (beginning) to procurement managers
title_full Life cycle cost (beginning) to procurement managers
title_fullStr Life cycle cost (beginning) to procurement managers
title_full_unstemmed Life cycle cost (beginning) to procurement managers
title_sort life cycle cost (beginning) to procurement managers
publishDate 2019
url http://irep.iium.edu.my/74171/
http://irep.iium.edu.my/74171/18/74171%20invitation%20letter.pdf
http://irep.iium.edu.my/74171/1/JKR-LCC%20BEGINNING-PART%201%2031072019.pdf
first_indexed 2023-09-18T21:45:05Z
last_indexed 2023-09-18T21:45:05Z
_version_ 1777413395750846464