Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder
This paper examines the perspectives of different parties involved in fire management/risks/protection system of heritage building. A survey questionnaire was developed based on the identified criteria of fire risks for heritage buildings in Malaysia. The survey questionnaire was administered to Fir...
Main Authors: | , , , , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/8432/ http://irep.iium.edu.my/8432/1/Fire_Risk_Assessment_of_Heritage_Building_%E2%80%93_Perspectives.pdf |
id |
iium-8432 |
---|---|
recordtype |
eprints |
spelling |
iium-84322012-02-27T07:51:59Z http://irep.iium.edu.my/8432/ Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder Ibrahim, Md. Najib Ibrahim, Mohd Shariffuddin Mohd Din, Azrin Abdul Hamid, Khirani Mohd Yunus, Rodzyah Yahya , Mohamad Ridzuan TH3301 Maintenance and repair This paper examines the perspectives of different parties involved in fire management/risks/protection system of heritage building. A survey questionnaire was developed based on the identified criteria of fire risks for heritage buildings in Malaysia. The survey questionnaire was administered to Fire Rescue Department Malaysia (FRDM) personnel, consultant and contractor, maintenance personnel (representing stakeholder). The data were analysed based on pair-wise comparison. It was found the perceptions of different parties differed from one another. 2011-07 Conference or Workshop Item PeerReviewed application/pdf en http://irep.iium.edu.my/8432/1/Fire_Risk_Assessment_of_Heritage_Building_%E2%80%93_Perspectives.pdf Ibrahim, Md. Najib and Ibrahim, Mohd Shariffuddin and Mohd Din, Azrin and Abdul Hamid, Khirani and Mohd Yunus, Rodzyah and Yahya , Mohamad Ridzuan (2011) Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder. In: 2nd International Building Control Conference, IBCC 2011, 11 to 12 July 2011 , Penang, Malaysia. |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
International Islamic University Malaysia |
building |
IIUM Repository |
collection |
Online Access |
language |
English |
topic |
TH3301 Maintenance and repair |
spellingShingle |
TH3301 Maintenance and repair Ibrahim, Md. Najib Ibrahim, Mohd Shariffuddin Mohd Din, Azrin Abdul Hamid, Khirani Mohd Yunus, Rodzyah Yahya , Mohamad Ridzuan Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder |
description |
This paper examines the perspectives of different parties involved in fire management/risks/protection system of heritage building. A survey questionnaire was developed based on the identified criteria of fire risks for heritage buildings in Malaysia. The survey questionnaire was administered to Fire Rescue Department Malaysia (FRDM) personnel, consultant and contractor, maintenance personnel (representing stakeholder). The data were analysed based on pair-wise comparison. It was found the perceptions of different parties differed from one another. |
format |
Conference or Workshop Item |
author |
Ibrahim, Md. Najib Ibrahim, Mohd Shariffuddin Mohd Din, Azrin Abdul Hamid, Khirani Mohd Yunus, Rodzyah Yahya , Mohamad Ridzuan |
author_facet |
Ibrahim, Md. Najib Ibrahim, Mohd Shariffuddin Mohd Din, Azrin Abdul Hamid, Khirani Mohd Yunus, Rodzyah Yahya , Mohamad Ridzuan |
author_sort |
Ibrahim, Md. Najib |
title |
Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder |
title_short |
Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder |
title_full |
Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder |
title_fullStr |
Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder |
title_full_unstemmed |
Fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder |
title_sort |
fire risk assessment of heritage building – perspectives of regulatory authority, restorer and building stakeholder |
publishDate |
2011 |
url |
http://irep.iium.edu.my/8432/ http://irep.iium.edu.my/8432/1/Fire_Risk_Assessment_of_Heritage_Building_%E2%80%93_Perspectives.pdf |
first_indexed |
2023-09-18T20:18:09Z |
last_indexed |
2023-09-18T20:18:09Z |
_version_ |
1777407926415130624 |