Regulatory Study to Encourage Energy Efficiency through Investment in Rehabilitation of Coal-fired Generation Plant in India
The Indian power sector suffers from considerable supply shortages. The Government of India (GoI) is addressing this problem both through a major new build program (including certain fiscal incentives for construction of larger and more efficient p...
Main Author: | |
---|---|
Format: | Policy Note |
Language: | English en_US |
Published: |
Washington, DC
2013
|
Subjects: | |
Online Access: | http://documents.worldbank.org/curated/en/2008/10/16465242/regulatory-study-encourage-energy-efficiency-through-investment-rehabilitation-coal-fired-generation-plant-india http://hdl.handle.net/10986/12684 |
id |
okr-10986-12684 |
---|---|
recordtype |
oai_dc |
repository_type |
Digital Repository |
institution_category |
Foreign Institution |
institution |
Digital Repositories |
building |
World Bank Open Knowledge Repository |
collection |
World Bank |
language |
English en_US |
topic |
ACCOUNTING ALLOCATION OF RISKS APPROACH ASSET MANAGEMENT ASSET MANAGEMENT PLAN AVAILABILITY BALANCE BARRIER BID BIDS BOILER BOTTOM ASH BURNERS CALORIFIC VALUE CAPITAL COSTS CAPITAL EXPENDITURE COAL COAL CONSUMPTION COAL SUPPLY COALS COMPETITIVE BIDDING COMPETITIVE BIDDING PROCESS COMPETITIVE MARKET COMPETITIVE POWER MARKETS COMPETITIVENESS CONVERSION EFFICIENCY COST OF CAPITAL COST OF POWER COST RECOVERY DEBT DEBT FINANCING DEVELOPMENT BANK DISINCENTIVE DISTRIBUTION COMPANIES DUE PROCESS ECONOMIC BENEFITS ECONOMIC EVALUATION ECONOMIC VIABILITY EFFICIENCY IMPROVEMENT ELECTRICITY ELECTRICITY GENERATION ENERGY AUDIT ENERGY EFFICIENCY ENERGY REQUIREMENT ENERGY REQUIREMENTS ENERGY SHORTAGES EQUIPMENT EXPENDITURE EXPENDITURES FINANCE CORPORATION FINANCIAL DISTRESS FINANCIAL EVALUATION FINANCIAL SAVING FINANCIAL SUPPORT FINANCIAL VIABILITY FRANCHISE MODEL FUEL FUEL ASH FUEL CONSUMPTION FUEL COST FUEL HEAT FUEL QUALITY FUEL SUPPLY FUEL OIL FURNACE WALL GAS GAS TURBINE GENERATING CAPACITY GENERATION GENERATION CAPACITY GENERATION PRICE GENERATORS GREENHOUSE GASES HEAT HEAT RATE HEAT RATES HEAT TRANSFER HEAVY FUEL OIL HOLDINGS INCREASE IN CAPACITY INDEXATION INFLATION INSTITUTIONAL CAPACITY INTEREST RATE INTERNATIONAL BEST PRACTICE INVESTING INVESTMENT DECISION INVESTMENT DECISIONS INVESTMENT OPTION INVESTMENT OPTIONS INVESTMENT PLANNING INVESTMENT REQUIREMENT INVESTMENT REQUIREMENTS JOINT VENTURE LEAST COST PLANNING LEGAL PROVISIONS LIABILITY LOAD FACTOR LOAD FACTORS LOAN MARGINAL COST MARGINAL COSTS MARKET CONDITIONS MARKET DEVELOPMENT MARKET ENVIRONMENT MARKET FORCES MARKET OVERSIGHT MARKET PRICE MARKET RATES MARKET RISK MARKET RISKS OPEN ACCESS OPEN MARKET OPERATIONAL EFFICIENCY OPERATIONAL RISKS OUTPUTS PEAK DEMAND PERFORMANCE INDICATORS PERFORMANCE TARGETS PLANT OPERATION PLANT OPERATIONS PLANT OUTPUT PLANT PERFORMANCE PLANT SHUTDOWN PORTFOLIO POWER POWER CORPORATION POWER PLANT POWER PLANTS POWER PROCUREMENT POWER PURCHASE POWER PURCHASE AGREEMENTS POWER PURCHASE PRICE POWER PURCHASES POWER PURCHASING COSTS POWER REQUIREMENTS POWER SECTOR POWER STATION POWER STATIONS PRESENT VALUE PRICE CAP PRICE DISCOVERY PRICE OF POWER PRICE REGULATION PRICE · VARIATIONS PRICING REGIME PRIVATE SECTOR INVESTOR PRIVATE SECTOR PARTICIPATION PURCHASING QUALITY FUEL RATE OF GROWTH RATE OF INVESTMENT RATE OF RETURN REGULATOR REGULATORS REGULATORY BARRIERS REGULATORY FRAMEWORK REGULATORY REGIME REGULATORY REGIMES REGULATORY SYSTEM RETAIL RETAIL TARIFFS RETURNS REVENUE CAP RISK MANAGEMENT RISK SHARING SALE SALES SAVINGS SERVICE PROVIDER STEAM TURBINE TARIFF STRUCTURE TAX THERMAL PLANT THERMAL POWER THERMAL POWER GENERATION TRADING UTILITIES VARIABLE COST VARIABLE COSTS |
spellingShingle |
ACCOUNTING ALLOCATION OF RISKS APPROACH ASSET MANAGEMENT ASSET MANAGEMENT PLAN AVAILABILITY BALANCE BARRIER BID BIDS BOILER BOTTOM ASH BURNERS CALORIFIC VALUE CAPITAL COSTS CAPITAL EXPENDITURE COAL COAL CONSUMPTION COAL SUPPLY COALS COMPETITIVE BIDDING COMPETITIVE BIDDING PROCESS COMPETITIVE MARKET COMPETITIVE POWER MARKETS COMPETITIVENESS CONVERSION EFFICIENCY COST OF CAPITAL COST OF POWER COST RECOVERY DEBT DEBT FINANCING DEVELOPMENT BANK DISINCENTIVE DISTRIBUTION COMPANIES DUE PROCESS ECONOMIC BENEFITS ECONOMIC EVALUATION ECONOMIC VIABILITY EFFICIENCY IMPROVEMENT ELECTRICITY ELECTRICITY GENERATION ENERGY AUDIT ENERGY EFFICIENCY ENERGY REQUIREMENT ENERGY REQUIREMENTS ENERGY SHORTAGES EQUIPMENT EXPENDITURE EXPENDITURES FINANCE CORPORATION FINANCIAL DISTRESS FINANCIAL EVALUATION FINANCIAL SAVING FINANCIAL SUPPORT FINANCIAL VIABILITY FRANCHISE MODEL FUEL FUEL ASH FUEL CONSUMPTION FUEL COST FUEL HEAT FUEL QUALITY FUEL SUPPLY FUEL OIL FURNACE WALL GAS GAS TURBINE GENERATING CAPACITY GENERATION GENERATION CAPACITY GENERATION PRICE GENERATORS GREENHOUSE GASES HEAT HEAT RATE HEAT RATES HEAT TRANSFER HEAVY FUEL OIL HOLDINGS INCREASE IN CAPACITY INDEXATION INFLATION INSTITUTIONAL CAPACITY INTEREST RATE INTERNATIONAL BEST PRACTICE INVESTING INVESTMENT DECISION INVESTMENT DECISIONS INVESTMENT OPTION INVESTMENT OPTIONS INVESTMENT PLANNING INVESTMENT REQUIREMENT INVESTMENT REQUIREMENTS JOINT VENTURE LEAST COST PLANNING LEGAL PROVISIONS LIABILITY LOAD FACTOR LOAD FACTORS LOAN MARGINAL COST MARGINAL COSTS MARKET CONDITIONS MARKET DEVELOPMENT MARKET ENVIRONMENT MARKET FORCES MARKET OVERSIGHT MARKET PRICE MARKET RATES MARKET RISK MARKET RISKS OPEN ACCESS OPEN MARKET OPERATIONAL EFFICIENCY OPERATIONAL RISKS OUTPUTS PEAK DEMAND PERFORMANCE INDICATORS PERFORMANCE TARGETS PLANT OPERATION PLANT OPERATIONS PLANT OUTPUT PLANT PERFORMANCE PLANT SHUTDOWN PORTFOLIO POWER POWER CORPORATION POWER PLANT POWER PLANTS POWER PROCUREMENT POWER PURCHASE POWER PURCHASE AGREEMENTS POWER PURCHASE PRICE POWER PURCHASES POWER PURCHASING COSTS POWER REQUIREMENTS POWER SECTOR POWER STATION POWER STATIONS PRESENT VALUE PRICE CAP PRICE DISCOVERY PRICE OF POWER PRICE REGULATION PRICE · VARIATIONS PRICING REGIME PRIVATE SECTOR INVESTOR PRIVATE SECTOR PARTICIPATION PURCHASING QUALITY FUEL RATE OF GROWTH RATE OF INVESTMENT RATE OF RETURN REGULATOR REGULATORS REGULATORY BARRIERS REGULATORY FRAMEWORK REGULATORY REGIME REGULATORY REGIMES REGULATORY SYSTEM RETAIL RETAIL TARIFFS RETURNS REVENUE CAP RISK MANAGEMENT RISK SHARING SALE SALES SAVINGS SERVICE PROVIDER STEAM TURBINE TARIFF STRUCTURE TAX THERMAL PLANT THERMAL POWER THERMAL POWER GENERATION TRADING UTILITIES VARIABLE COST VARIABLE COSTS World Bank Regulatory Study to Encourage Energy Efficiency through Investment in Rehabilitation of Coal-fired Generation Plant in India |
geographic_facet |
South Asia India |
description |
The Indian power sector suffers from
considerable supply shortages. The Government of India (GoI)
is addressing this problem both through a major new build
program (including certain fiscal incentives for
construction of larger and more efficient plant) and through
rehabilitation (renovation and modernization or (R&M) as
it is known in India) of existing coal fired plant. Around
two-thirds of India's existing 65,000 MW of coal fired
plant capacity is owned by State Government utilities, but
much of this is reported to be in a poor condition, with low
load factors and station heat rates of up to a 4,000
kcal/kWh. Current R&M activity is not keeping pace with
the requirements. R&M implementation has lagged
significantly behind the requirements over the 10th plan
period (2002-07), and during the current 11th plan period
nearly 13,000 MW of R&M is targeted. Specifically:
section two sets out the context of the study; section three
summarizes the constraints and barriers to energy efficient
R&M in India, which are set out in further detail in
annex four; section four provides a framework for the main
options identified, given present state of the Indian power
market and describes the key lessons from our review of
international best practice, which are described in annex
five; section five identifies the various options considered
for this study; section six analyses the various options
identified in terms of their effectiveness in addressing the
barriers and constraints identified in section three; and
section seven sets out our conclusions and recommendations
for a regulatory framework that can more effectively support
energy efficient R&M in India. |
format |
Economic & Sector Work :: Policy Note |
author |
World Bank |
author_facet |
World Bank |
author_sort |
World Bank |
title |
Regulatory Study to Encourage Energy Efficiency through Investment in Rehabilitation of Coal-fired Generation Plant in India |
title_short |
Regulatory Study to Encourage Energy Efficiency through Investment in Rehabilitation of Coal-fired Generation Plant in India |
title_full |
Regulatory Study to Encourage Energy Efficiency through Investment in Rehabilitation of Coal-fired Generation Plant in India |
title_fullStr |
Regulatory Study to Encourage Energy Efficiency through Investment in Rehabilitation of Coal-fired Generation Plant in India |
title_full_unstemmed |
Regulatory Study to Encourage Energy Efficiency through Investment in Rehabilitation of Coal-fired Generation Plant in India |
title_sort |
regulatory study to encourage energy efficiency through investment in rehabilitation of coal-fired generation plant in india |
publisher |
Washington, DC |
publishDate |
2013 |
url |
http://documents.worldbank.org/curated/en/2008/10/16465242/regulatory-study-encourage-energy-efficiency-through-investment-rehabilitation-coal-fired-generation-plant-india http://hdl.handle.net/10986/12684 |
_version_ |
1764421741108527104 |
spelling |
okr-10986-126842021-04-23T14:03:05Z Regulatory Study to Encourage Energy Efficiency through Investment in Rehabilitation of Coal-fired Generation Plant in India World Bank ACCOUNTING ALLOCATION OF RISKS APPROACH ASSET MANAGEMENT ASSET MANAGEMENT PLAN AVAILABILITY BALANCE BARRIER BID BIDS BOILER BOTTOM ASH BURNERS CALORIFIC VALUE CAPITAL COSTS CAPITAL EXPENDITURE COAL COAL CONSUMPTION COAL SUPPLY COALS COMPETITIVE BIDDING COMPETITIVE BIDDING PROCESS COMPETITIVE MARKET COMPETITIVE POWER MARKETS COMPETITIVENESS CONVERSION EFFICIENCY COST OF CAPITAL COST OF POWER COST RECOVERY DEBT DEBT FINANCING DEVELOPMENT BANK DISINCENTIVE DISTRIBUTION COMPANIES DUE PROCESS ECONOMIC BENEFITS ECONOMIC EVALUATION ECONOMIC VIABILITY EFFICIENCY IMPROVEMENT ELECTRICITY ELECTRICITY GENERATION ENERGY AUDIT ENERGY EFFICIENCY ENERGY REQUIREMENT ENERGY REQUIREMENTS ENERGY SHORTAGES EQUIPMENT EXPENDITURE EXPENDITURES FINANCE CORPORATION FINANCIAL DISTRESS FINANCIAL EVALUATION FINANCIAL SAVING FINANCIAL SUPPORT FINANCIAL VIABILITY FRANCHISE MODEL FUEL FUEL ASH FUEL CONSUMPTION FUEL COST FUEL HEAT FUEL QUALITY FUEL SUPPLY FUEL OIL FURNACE WALL GAS GAS TURBINE GENERATING CAPACITY GENERATION GENERATION CAPACITY GENERATION PRICE GENERATORS GREENHOUSE GASES HEAT HEAT RATE HEAT RATES HEAT TRANSFER HEAVY FUEL OIL HOLDINGS INCREASE IN CAPACITY INDEXATION INFLATION INSTITUTIONAL CAPACITY INTEREST RATE INTERNATIONAL BEST PRACTICE INVESTING INVESTMENT DECISION INVESTMENT DECISIONS INVESTMENT OPTION INVESTMENT OPTIONS INVESTMENT PLANNING INVESTMENT REQUIREMENT INVESTMENT REQUIREMENTS JOINT VENTURE LEAST COST PLANNING LEGAL PROVISIONS LIABILITY LOAD FACTOR LOAD FACTORS LOAN MARGINAL COST MARGINAL COSTS MARKET CONDITIONS MARKET DEVELOPMENT MARKET ENVIRONMENT MARKET FORCES MARKET OVERSIGHT MARKET PRICE MARKET RATES MARKET RISK MARKET RISKS OPEN ACCESS OPEN MARKET OPERATIONAL EFFICIENCY OPERATIONAL RISKS OUTPUTS PEAK DEMAND PERFORMANCE INDICATORS PERFORMANCE TARGETS PLANT OPERATION PLANT OPERATIONS PLANT OUTPUT PLANT PERFORMANCE PLANT SHUTDOWN PORTFOLIO POWER POWER CORPORATION POWER PLANT POWER PLANTS POWER PROCUREMENT POWER PURCHASE POWER PURCHASE AGREEMENTS POWER PURCHASE PRICE POWER PURCHASES POWER PURCHASING COSTS POWER REQUIREMENTS POWER SECTOR POWER STATION POWER STATIONS PRESENT VALUE PRICE CAP PRICE DISCOVERY PRICE OF POWER PRICE REGULATION PRICE · VARIATIONS PRICING REGIME PRIVATE SECTOR INVESTOR PRIVATE SECTOR PARTICIPATION PURCHASING QUALITY FUEL RATE OF GROWTH RATE OF INVESTMENT RATE OF RETURN REGULATOR REGULATORS REGULATORY BARRIERS REGULATORY FRAMEWORK REGULATORY REGIME REGULATORY REGIMES REGULATORY SYSTEM RETAIL RETAIL TARIFFS RETURNS REVENUE CAP RISK MANAGEMENT RISK SHARING SALE SALES SAVINGS SERVICE PROVIDER STEAM TURBINE TARIFF STRUCTURE TAX THERMAL PLANT THERMAL POWER THERMAL POWER GENERATION TRADING UTILITIES VARIABLE COST VARIABLE COSTS The Indian power sector suffers from considerable supply shortages. The Government of India (GoI) is addressing this problem both through a major new build program (including certain fiscal incentives for construction of larger and more efficient plant) and through rehabilitation (renovation and modernization or (R&M) as it is known in India) of existing coal fired plant. Around two-thirds of India's existing 65,000 MW of coal fired plant capacity is owned by State Government utilities, but much of this is reported to be in a poor condition, with low load factors and station heat rates of up to a 4,000 kcal/kWh. Current R&M activity is not keeping pace with the requirements. R&M implementation has lagged significantly behind the requirements over the 10th plan period (2002-07), and during the current 11th plan period nearly 13,000 MW of R&M is targeted. Specifically: section two sets out the context of the study; section three summarizes the constraints and barriers to energy efficient R&M in India, which are set out in further detail in annex four; section four provides a framework for the main options identified, given present state of the Indian power market and describes the key lessons from our review of international best practice, which are described in annex five; section five identifies the various options considered for this study; section six analyses the various options identified in terms of their effectiveness in addressing the barriers and constraints identified in section three; and section seven sets out our conclusions and recommendations for a regulatory framework that can more effectively support energy efficient R&M in India. 2013-03-12T21:44:51Z 2013-03-12T21:44:51Z 2008-10 http://documents.worldbank.org/curated/en/2008/10/16465242/regulatory-study-encourage-energy-efficiency-through-investment-rehabilitation-coal-fired-generation-plant-india http://hdl.handle.net/10986/12684 English en_US CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo/ World Bank Washington, DC Economic & Sector Work :: Policy Note Economic & Sector Work South Asia India |