Burgos Wind Farm Project : The Philippines Technical Desk Review
This report presents the findings of a review carried out by Riso National Laboratory of a 30MW wind farm in Northern Luzon, The Philippines. The review was commissioned by the World Bank and is intended as a brief second opinion desk review of the...
Main Authors: | , , , |
---|---|
Format: | Other Infrastructure Study |
Language: | English en_US |
Published: |
World Bank, Washington, DC
2013
|
Subjects: | |
Online Access: | http://documents.worldbank.org/curated/en/2012/01/16366543/burgos-wind-farm-project-philippines-technical-desk-review http://hdl.handle.net/10986/12919 |
Summary: | This report presents the findings of a
review carried out by Riso National Laboratory of a 30MW
wind farm in Northern Luzon, The Philippines. The review was
commissioned by the World Bank and is intended as a brief
second opinion desk review of the technical, contractual and
financial aspects of the project. The evaluation of the
Annual Energy Production of the site by PNOC-EDC seems to
follow accepted practice and where shortcomings have been
found by the review, it is considered that their correction
would not change the outcome significantly. For example,
only data from one year has been used but the review has
found that it is probably unnecessary to correct the data
for long term deviations, having looked at historical data
from other sources. Two wind turbine layouts were assessed
and it was seen that, apart from some minor adjustments, the
layout is more or less optimal. The precise layout and
optimization will, in any case, be done by the contractor. |
---|