Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River
The report examines three case studies in Tanzania, and presents the findings for hydropower development, based on cost-effective schemes designs, intended to benefit the country's state-owned electric power utility - TANESCO - for power gener...
Main Author: | |
---|---|
Format: | ESMAP Paper |
Language: | English en_US |
Published: |
World Bank, Washington, DC
2014
|
Subjects: | |
Online Access: | http://documents.worldbank.org/curated/en/2000/03/2085175/tanzania-mini-hydropower-development-case-studies-malagarasi-muhuwesi-kikuletwa-rivers-vol-2-3-case-study-muhuwesi-river http://hdl.handle.net/10986/20322 |
id |
okr-10986-20322 |
---|---|
recordtype |
oai_dc |
spelling |
okr-10986-203222021-04-23T14:03:37Z Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River Secsd (P) Ltd. ACCESS ROAD ACCESS ROADS ACCESS TO ELECTRICITY CIVIL WORKS CONSTRUCTION CONSTRUCTION MATERIALS CONSTRUCTION PERIOD COST SAVINGS DIESEL POWER DRAINAGE ECONOMIC ANALYSIS ECONOMIC GROWTH ECONOMIC VALUE ECONOMISTS ELECTRIC POWER ELECTRICAL ENERGY ELECTRIFICATION ENERGY BALANCE ENERGY COST ENERGY COSTS ENERGY DEMAND ENERGY GENERATION ENERGY MARKETS ENERGY SECTOR ENGINEERING ENGINEERS FLOW DATA FUEL GENERATOR GRID GRID CONNECTION GRID SUPPLY HYDRO GENERATING HYDRO PROJECTS HYDRO RESOURCES HYDROELECTRIC PROJECT HYDROLOGICAL STUDIES HYDROLOGY HYDROPOWER HYDROPOWER DEVELOPMENT HYDROPOWER POTENTIAL HYDROPOWER PROJECTS INCOME LEISURE LOAD FACTOR LOAD SHEDDING NATIONAL GRID POWER POWER GENERATION POWER STATIONS PRESSURE RADIO REMOTE RESERVOIR AREA RIVER RIVER BASIN DEVELOPMENT RIVER BASINS RIVER FLOW RIVERS ROAD CONNECTIONS ROD ROUTE RUNOFF RURAL ELECTRIFICATION SMALL HYDROPOWER STREAMS STRUCTURES TAG TEMPERATURE The report examines three case studies in Tanzania, and presents the findings for hydropower development, based on cost-effective schemes designs, intended to benefit the country's state-owned electric power utility - TANESCO - for power generation, transmission, and distribution. The primary objective of the study is to look for economical, and reliable alternatives for meeting the growing electric power demand in different regions, particularly remote, and not yet served by the national grid. The existing local grid supply is by and large, from diesel-engine-driven generators, thus not reliable, and expensive to operate, and maintain. Each case study reviews the project area and its topographic features, surveying geological and hydrological aspects, to assess power, and energy, and civil works requirements. An economical, financial, and sensitivity analysis was conducted, and implementation costs are presented, including environmental considerations. Recommendations suggest a cascade development, consisting of small hydropower stations at the Malagarasi River; implement a series of small hydropower projects close to the demand center for the Muhuwesi River; and, a medium hydropower project close to the demand center, for the Kikuletwa River. 2014-09-30T21:17:21Z 2014-09-30T21:17:21Z 2002-04 http://documents.worldbank.org/curated/en/2000/03/2085175/tanzania-mini-hydropower-development-case-studies-malagarasi-muhuwesi-kikuletwa-rivers-vol-2-3-case-study-muhuwesi-river http://hdl.handle.net/10986/20322 English en_US Energy Sector Management Assistance Programme (ESMAP) technical paper series;no. 24 CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo/ World Bank, Washington, DC Publications & Research :: ESMAP Paper Publications & Research Africa Tanzania |
repository_type |
Digital Repository |
institution_category |
Foreign Institution |
institution |
Digital Repositories |
building |
World Bank Open Knowledge Repository |
collection |
World Bank |
language |
English en_US |
topic |
ACCESS ROAD ACCESS ROADS ACCESS TO ELECTRICITY CIVIL WORKS CONSTRUCTION CONSTRUCTION MATERIALS CONSTRUCTION PERIOD COST SAVINGS DIESEL POWER DRAINAGE ECONOMIC ANALYSIS ECONOMIC GROWTH ECONOMIC VALUE ECONOMISTS ELECTRIC POWER ELECTRICAL ENERGY ELECTRIFICATION ENERGY BALANCE ENERGY COST ENERGY COSTS ENERGY DEMAND ENERGY GENERATION ENERGY MARKETS ENERGY SECTOR ENGINEERING ENGINEERS FLOW DATA FUEL GENERATOR GRID GRID CONNECTION GRID SUPPLY HYDRO GENERATING HYDRO PROJECTS HYDRO RESOURCES HYDROELECTRIC PROJECT HYDROLOGICAL STUDIES HYDROLOGY HYDROPOWER HYDROPOWER DEVELOPMENT HYDROPOWER POTENTIAL HYDROPOWER PROJECTS INCOME LEISURE LOAD FACTOR LOAD SHEDDING NATIONAL GRID POWER POWER GENERATION POWER STATIONS PRESSURE RADIO REMOTE RESERVOIR AREA RIVER RIVER BASIN DEVELOPMENT RIVER BASINS RIVER FLOW RIVERS ROAD CONNECTIONS ROD ROUTE RUNOFF RURAL ELECTRIFICATION SMALL HYDROPOWER STREAMS STRUCTURES TAG TEMPERATURE |
spellingShingle |
ACCESS ROAD ACCESS ROADS ACCESS TO ELECTRICITY CIVIL WORKS CONSTRUCTION CONSTRUCTION MATERIALS CONSTRUCTION PERIOD COST SAVINGS DIESEL POWER DRAINAGE ECONOMIC ANALYSIS ECONOMIC GROWTH ECONOMIC VALUE ECONOMISTS ELECTRIC POWER ELECTRICAL ENERGY ELECTRIFICATION ENERGY BALANCE ENERGY COST ENERGY COSTS ENERGY DEMAND ENERGY GENERATION ENERGY MARKETS ENERGY SECTOR ENGINEERING ENGINEERS FLOW DATA FUEL GENERATOR GRID GRID CONNECTION GRID SUPPLY HYDRO GENERATING HYDRO PROJECTS HYDRO RESOURCES HYDROELECTRIC PROJECT HYDROLOGICAL STUDIES HYDROLOGY HYDROPOWER HYDROPOWER DEVELOPMENT HYDROPOWER POTENTIAL HYDROPOWER PROJECTS INCOME LEISURE LOAD FACTOR LOAD SHEDDING NATIONAL GRID POWER POWER GENERATION POWER STATIONS PRESSURE RADIO REMOTE RESERVOIR AREA RIVER RIVER BASIN DEVELOPMENT RIVER BASINS RIVER FLOW RIVERS ROAD CONNECTIONS ROD ROUTE RUNOFF RURAL ELECTRIFICATION SMALL HYDROPOWER STREAMS STRUCTURES TAG TEMPERATURE Secsd (P) Ltd. Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River |
geographic_facet |
Africa Tanzania |
relation |
Energy Sector Management Assistance
Programme (ESMAP) technical paper series;no. 24 |
description |
The report examines three case studies
in Tanzania, and presents the findings for hydropower
development, based on cost-effective schemes designs,
intended to benefit the country's state-owned electric
power utility - TANESCO - for power generation,
transmission, and distribution. The primary objective of the
study is to look for economical, and reliable alternatives
for meeting the growing electric power demand in different
regions, particularly remote, and not yet served by the
national grid. The existing local grid supply is by and
large, from diesel-engine-driven generators, thus not
reliable, and expensive to operate, and maintain. Each case
study reviews the project area and its topographic features,
surveying geological and hydrological aspects, to assess
power, and energy, and civil works requirements. An
economical, financial, and sensitivity analysis was
conducted, and implementation costs are presented, including
environmental considerations. Recommendations suggest a
cascade development, consisting of small hydropower stations
at the Malagarasi River; implement a series of small
hydropower projects close to the demand center for the
Muhuwesi River; and, a medium hydropower project close to
the demand center, for the Kikuletwa River. |
format |
Publications & Research :: ESMAP Paper |
author |
Secsd (P) Ltd. |
author_facet |
Secsd (P) Ltd. |
author_sort |
Secsd (P) Ltd. |
title |
Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River |
title_short |
Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River |
title_full |
Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River |
title_fullStr |
Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River |
title_full_unstemmed |
Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River |
title_sort |
tanzania pre-investment report on mini hydropower development : case study on the muhuwesi river |
publisher |
World Bank, Washington, DC |
publishDate |
2014 |
url |
http://documents.worldbank.org/curated/en/2000/03/2085175/tanzania-mini-hydropower-development-case-studies-malagarasi-muhuwesi-kikuletwa-rivers-vol-2-3-case-study-muhuwesi-river http://hdl.handle.net/10986/20322 |
_version_ |
1764437210307756032 |