Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River

The report examines three case studies in Tanzania, and presents the findings for hydropower development, based on cost-effective schemes designs, intended to benefit the country's state-owned electric power utility - TANESCO - for power gener...

Full description

Bibliographic Details
Main Author: Secsd (P) Ltd.
Format: ESMAP Paper
Language:English
en_US
Published: World Bank, Washington, DC 2014
Subjects:
Online Access:http://documents.worldbank.org/curated/en/2000/03/2085175/tanzania-mini-hydropower-development-case-studies-malagarasi-muhuwesi-kikuletwa-rivers-vol-2-3-case-study-muhuwesi-river
http://hdl.handle.net/10986/20322
id okr-10986-20322
recordtype oai_dc
spelling okr-10986-203222021-04-23T14:03:37Z Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River Secsd (P) Ltd. ACCESS ROAD ACCESS ROADS ACCESS TO ELECTRICITY CIVIL WORKS CONSTRUCTION CONSTRUCTION MATERIALS CONSTRUCTION PERIOD COST SAVINGS DIESEL POWER DRAINAGE ECONOMIC ANALYSIS ECONOMIC GROWTH ECONOMIC VALUE ECONOMISTS ELECTRIC POWER ELECTRICAL ENERGY ELECTRIFICATION ENERGY BALANCE ENERGY COST ENERGY COSTS ENERGY DEMAND ENERGY GENERATION ENERGY MARKETS ENERGY SECTOR ENGINEERING ENGINEERS FLOW DATA FUEL GENERATOR GRID GRID CONNECTION GRID SUPPLY HYDRO GENERATING HYDRO PROJECTS HYDRO RESOURCES HYDROELECTRIC PROJECT HYDROLOGICAL STUDIES HYDROLOGY HYDROPOWER HYDROPOWER DEVELOPMENT HYDROPOWER POTENTIAL HYDROPOWER PROJECTS INCOME LEISURE LOAD FACTOR LOAD SHEDDING NATIONAL GRID POWER POWER GENERATION POWER STATIONS PRESSURE RADIO REMOTE RESERVOIR AREA RIVER RIVER BASIN DEVELOPMENT RIVER BASINS RIVER FLOW RIVERS ROAD CONNECTIONS ROD ROUTE RUNOFF RURAL ELECTRIFICATION SMALL HYDROPOWER STREAMS STRUCTURES TAG TEMPERATURE The report examines three case studies in Tanzania, and presents the findings for hydropower development, based on cost-effective schemes designs, intended to benefit the country's state-owned electric power utility - TANESCO - for power generation, transmission, and distribution. The primary objective of the study is to look for economical, and reliable alternatives for meeting the growing electric power demand in different regions, particularly remote, and not yet served by the national grid. The existing local grid supply is by and large, from diesel-engine-driven generators, thus not reliable, and expensive to operate, and maintain. Each case study reviews the project area and its topographic features, surveying geological and hydrological aspects, to assess power, and energy, and civil works requirements. An economical, financial, and sensitivity analysis was conducted, and implementation costs are presented, including environmental considerations. Recommendations suggest a cascade development, consisting of small hydropower stations at the Malagarasi River; implement a series of small hydropower projects close to the demand center for the Muhuwesi River; and, a medium hydropower project close to the demand center, for the Kikuletwa River. 2014-09-30T21:17:21Z 2014-09-30T21:17:21Z 2002-04 http://documents.worldbank.org/curated/en/2000/03/2085175/tanzania-mini-hydropower-development-case-studies-malagarasi-muhuwesi-kikuletwa-rivers-vol-2-3-case-study-muhuwesi-river http://hdl.handle.net/10986/20322 English en_US Energy Sector Management Assistance Programme (ESMAP) technical paper series;no. 24 CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo/ World Bank, Washington, DC Publications & Research :: ESMAP Paper Publications & Research Africa Tanzania
repository_type Digital Repository
institution_category Foreign Institution
institution Digital Repositories
building World Bank Open Knowledge Repository
collection World Bank
language English
en_US
topic ACCESS ROAD
ACCESS ROADS
ACCESS TO ELECTRICITY
CIVIL WORKS
CONSTRUCTION
CONSTRUCTION MATERIALS
CONSTRUCTION PERIOD
COST SAVINGS
DIESEL POWER
DRAINAGE
ECONOMIC ANALYSIS
ECONOMIC GROWTH
ECONOMIC VALUE
ECONOMISTS
ELECTRIC POWER
ELECTRICAL ENERGY
ELECTRIFICATION
ENERGY BALANCE
ENERGY COST
ENERGY COSTS
ENERGY DEMAND
ENERGY GENERATION
ENERGY MARKETS
ENERGY SECTOR
ENGINEERING
ENGINEERS
FLOW DATA
FUEL
GENERATOR
GRID
GRID CONNECTION
GRID SUPPLY
HYDRO GENERATING
HYDRO PROJECTS
HYDRO RESOURCES
HYDROELECTRIC PROJECT
HYDROLOGICAL STUDIES
HYDROLOGY
HYDROPOWER
HYDROPOWER DEVELOPMENT
HYDROPOWER POTENTIAL
HYDROPOWER PROJECTS
INCOME
LEISURE
LOAD FACTOR
LOAD SHEDDING
NATIONAL GRID
POWER
POWER GENERATION
POWER STATIONS
PRESSURE
RADIO
REMOTE
RESERVOIR AREA
RIVER
RIVER BASIN DEVELOPMENT
RIVER BASINS
RIVER FLOW
RIVERS
ROAD CONNECTIONS
ROD
ROUTE
RUNOFF
RURAL ELECTRIFICATION
SMALL HYDROPOWER
STREAMS
STRUCTURES
TAG
TEMPERATURE
spellingShingle ACCESS ROAD
ACCESS ROADS
ACCESS TO ELECTRICITY
CIVIL WORKS
CONSTRUCTION
CONSTRUCTION MATERIALS
CONSTRUCTION PERIOD
COST SAVINGS
DIESEL POWER
DRAINAGE
ECONOMIC ANALYSIS
ECONOMIC GROWTH
ECONOMIC VALUE
ECONOMISTS
ELECTRIC POWER
ELECTRICAL ENERGY
ELECTRIFICATION
ENERGY BALANCE
ENERGY COST
ENERGY COSTS
ENERGY DEMAND
ENERGY GENERATION
ENERGY MARKETS
ENERGY SECTOR
ENGINEERING
ENGINEERS
FLOW DATA
FUEL
GENERATOR
GRID
GRID CONNECTION
GRID SUPPLY
HYDRO GENERATING
HYDRO PROJECTS
HYDRO RESOURCES
HYDROELECTRIC PROJECT
HYDROLOGICAL STUDIES
HYDROLOGY
HYDROPOWER
HYDROPOWER DEVELOPMENT
HYDROPOWER POTENTIAL
HYDROPOWER PROJECTS
INCOME
LEISURE
LOAD FACTOR
LOAD SHEDDING
NATIONAL GRID
POWER
POWER GENERATION
POWER STATIONS
PRESSURE
RADIO
REMOTE
RESERVOIR AREA
RIVER
RIVER BASIN DEVELOPMENT
RIVER BASINS
RIVER FLOW
RIVERS
ROAD CONNECTIONS
ROD
ROUTE
RUNOFF
RURAL ELECTRIFICATION
SMALL HYDROPOWER
STREAMS
STRUCTURES
TAG
TEMPERATURE
Secsd (P) Ltd.
Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River
geographic_facet Africa
Tanzania
relation Energy Sector Management Assistance Programme (ESMAP) technical paper series;no. 24
description The report examines three case studies in Tanzania, and presents the findings for hydropower development, based on cost-effective schemes designs, intended to benefit the country's state-owned electric power utility - TANESCO - for power generation, transmission, and distribution. The primary objective of the study is to look for economical, and reliable alternatives for meeting the growing electric power demand in different regions, particularly remote, and not yet served by the national grid. The existing local grid supply is by and large, from diesel-engine-driven generators, thus not reliable, and expensive to operate, and maintain. Each case study reviews the project area and its topographic features, surveying geological and hydrological aspects, to assess power, and energy, and civil works requirements. An economical, financial, and sensitivity analysis was conducted, and implementation costs are presented, including environmental considerations. Recommendations suggest a cascade development, consisting of small hydropower stations at the Malagarasi River; implement a series of small hydropower projects close to the demand center for the Muhuwesi River; and, a medium hydropower project close to the demand center, for the Kikuletwa River.
format Publications & Research :: ESMAP Paper
author Secsd (P) Ltd.
author_facet Secsd (P) Ltd.
author_sort Secsd (P) Ltd.
title Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River
title_short Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River
title_full Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River
title_fullStr Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River
title_full_unstemmed Tanzania Pre-Investment Report on Mini Hydropower Development : Case Study on the Muhuwesi River
title_sort tanzania pre-investment report on mini hydropower development : case study on the muhuwesi river
publisher World Bank, Washington, DC
publishDate 2014
url http://documents.worldbank.org/curated/en/2000/03/2085175/tanzania-mini-hydropower-development-case-studies-malagarasi-muhuwesi-kikuletwa-rivers-vol-2-3-case-study-muhuwesi-river
http://hdl.handle.net/10986/20322
_version_ 1764437210307756032