Perpustakaan Negara Malaysia Jalan Pekeliling Kuala Lumpur / Adenan Omar
Under the Second Malaysia Plan the Federal Governemnt provided an allocation of $2.5 million for the construction of the National Library Building. A 6 acre site was accordingly purchased in 1971 adjacent to Muzium Negara but owing to various factors, construction could not be undertaken early in th...
Main Author: | Omar, Adenan |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Architecture, Planning and Surveying
1983
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/1133/ http://ir.uitm.edu.my/id/eprint/1133/1/PPb_ADENAN%20OMAR%20AP%2083_5%20P01.pdf |
Similar Items
-
Kajian tentang keberkesanan sistem terminal perhentian bas masakini di sekitar Kuala Lumpur. Kes kajian 1) Terminal Hentian Puduraya 2)Terminal Perhentian Bas Kelang 3) Terminal Perhentian Bas Pekeliling / Sanusi Husin
by: Husin, Sanusi
Published: (1989) -
Kilang bertingkat : Pembangunan masa kini di Kuala Lumpur / Ahmad Badri Mohd Zahir
by: Mohd Zahir, Ahmad Badri
Published: (1986) -
Compatibility issues of Industrialized Building System (IBS) in interior construction: a case study in Kuala Lumpur
by: Yaman, Rostam, et al.
Published: (2019) -
Kajian ruang tamu (lobby) di bangunan hotel. Kes kajian : Hotel Park Royal , Kuala Lumpur / Sairie Tarman
by: Tarman, Sairie
Published: (1990) -
Keberkesanan penggunaan konsep sekolah rumah pangsa dari aspek fizikal, sosial dan ekonomi. Kajian Kes, Sekolah Rendah Kebangsaan Bt. 3 1/2, Jalan Cheras, Kuala Lumpur / Ab Ran Muhammad
by: Muhammad, Ab Ran
Published: (1984)