Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali

Under the Ninth Malaysia Plan (9MP), Jabatan Kerja Raya (JKR) was burdened by too many projects. Therefore, financial and time losses sometimes occurred during the process of building procurement until project implementation when managing risks not properly. The aim of this study was to assess the m...

Full description

Bibliographic Details
Main Author: Jumali, Saiful
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/14337/
http://ir.uitm.edu.my/id/eprint/14337/1/TM_SAIFUL%20JUMALI%20EC%2014_5.pdf
id uitm-14337
recordtype eprints
spelling uitm-143372016-08-18T09:04:37Z http://ir.uitm.edu.my/id/eprint/14337/ Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali Jumali, Saiful Malaysia Construction details. Including foundations, maintenance, equipment Under the Ninth Malaysia Plan (9MP), Jabatan Kerja Raya (JKR) was burdened by too many projects. Therefore, financial and time losses sometimes occurred during the process of building procurement until project implementation when managing risks not properly. The aim of this study was to assess the maturity of risk management for construction projects in JKR. In order to achieve this aim, three objectives have been outlined in this study; to establish the relationship between attributes, to identify the high influence indices of risk management attributes for construction projects in JKR and to identify the current overall risk management maturity for construction projects in JKR. In this study, four attributes were chosen for JKR risk management maturity model. The four attributes namely culture/ awareness, experiences, processes and practices. Therefore, in this study had used four levels of maturity namely level 1: Initial, level 2: Established, level 3: Managed and level 4: Optimized. This study was conducted using a questionnaire survey among professional in all JKR branches which cover business sector, management sector, expert sector and JKR state. A total of 133 out of 580 completed questionnaires were returned. This research found a strong and positive relationship between processes attribute and experiences attribute [r=0.781,N=133, p=0.0005]. The high influence indices of risk management attributes for construction projects in JKR was the acceptance of risk management in JKR. The empirical research findings showed that the overall risk management maturity levels for construction projects in the JKR were 2.52. The four (4) attributes to assess risk management maturity for construction projects in JKR namely culture/ awareness, experiences, processes and practices were achieved between level 2 and level 3 or between “managed" and “optimized” based on the JKR Risk Management Maturity Model proposed in this research. 2014 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/14337/1/TM_SAIFUL%20JUMALI%20EC%2014_5.pdf Jumali, Saiful (2014) Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali. Masters thesis, Universiti Teknologi MARA.
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Malaysia
Construction details. Including foundations, maintenance, equipment
spellingShingle Malaysia
Construction details. Including foundations, maintenance, equipment
Jumali, Saiful
Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali
description Under the Ninth Malaysia Plan (9MP), Jabatan Kerja Raya (JKR) was burdened by too many projects. Therefore, financial and time losses sometimes occurred during the process of building procurement until project implementation when managing risks not properly. The aim of this study was to assess the maturity of risk management for construction projects in JKR. In order to achieve this aim, three objectives have been outlined in this study; to establish the relationship between attributes, to identify the high influence indices of risk management attributes for construction projects in JKR and to identify the current overall risk management maturity for construction projects in JKR. In this study, four attributes were chosen for JKR risk management maturity model. The four attributes namely culture/ awareness, experiences, processes and practices. Therefore, in this study had used four levels of maturity namely level 1: Initial, level 2: Established, level 3: Managed and level 4: Optimized. This study was conducted using a questionnaire survey among professional in all JKR branches which cover business sector, management sector, expert sector and JKR state. A total of 133 out of 580 completed questionnaires were returned. This research found a strong and positive relationship between processes attribute and experiences attribute [r=0.781,N=133, p=0.0005]. The high influence indices of risk management attributes for construction projects in JKR was the acceptance of risk management in JKR. The empirical research findings showed that the overall risk management maturity levels for construction projects in the JKR were 2.52. The four (4) attributes to assess risk management maturity for construction projects in JKR namely culture/ awareness, experiences, processes and practices were achieved between level 2 and level 3 or between “managed" and “optimized” based on the JKR Risk Management Maturity Model proposed in this research.
format Thesis
author Jumali, Saiful
author_facet Jumali, Saiful
author_sort Jumali, Saiful
title Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali
title_short Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali
title_full Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali
title_fullStr Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali
title_full_unstemmed Assessing risk management maturity for construction projects in Jabatan Kerja Raya (JKR) / Saiful Jumali
title_sort assessing risk management maturity for construction projects in jabatan kerja raya (jkr) / saiful jumali
publishDate 2014
url http://ir.uitm.edu.my/id/eprint/14337/
http://ir.uitm.edu.my/id/eprint/14337/1/TM_SAIFUL%20JUMALI%20EC%2014_5.pdf
first_indexed 2023-09-18T22:51:23Z
last_indexed 2023-09-18T22:51:23Z
_version_ 1777417567837618176