Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa

The final exam invigilation schedule in UiTM Malacca Jasin campus is prepared by UiTM Pulau Pinang Scheduling System, where all the factors and information of lecturers’ constraint being sent there by the Examination Unit. There is always a delay in waiting for the invigilation schedule to be announ...

Full description

Bibliographic Details
Main Author: Mustapa, Maizatul Akmam
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/14532/
http://ir.uitm.edu.my/id/eprint/14532/1/TD_MAIZATUL%20AKMAM%20MUSTAPA%20CS%2015_5.pdf
id uitm-14532
recordtype eprints
spelling uitm-145322016-08-17T06:50:10Z http://ir.uitm.edu.my/id/eprint/14532/ Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa Mustapa, Maizatul Akmam Melaka Programming. Rule-based programming. Backtrack programming The final exam invigilation schedule in UiTM Malacca Jasin campus is prepared by UiTM Pulau Pinang Scheduling System, where all the factors and information of lecturers’ constraint being sent there by the Examination Unit. There is always a delay in waiting for the invigilation schedule to be announced. If there are any changes of the schedule after the schedule is generated, the schedule will not be updated in the system. The schedule changing process is done manually by form. The Exam Invigilation Scheduling System aims to own a scheduling system in the campus and reduce the time used in creating the invigilation schedule. To solve the invigilation scheduling problem, constraint based technique with rule based approach is used to find the optimal solution. Rule based technique is used in searching method and involve knowledge base as the data constraint store. In developing the project, software prototyping model was used which involves of the preliminary investigation, requirement definition, system design, system development, system testing and system prototype phase. Two interviews have been conducted as data collection method. The findings of the project include the system requirements and rules. There were ten rules involved in creating the invigilation schedule. The project does not assist in changing the invigilator assigned in the invigilation schedule. Thus, it is recommended to provide function that allows the application of schedule changes for future works. 2015 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/14532/1/TD_MAIZATUL%20AKMAM%20MUSTAPA%20CS%2015_5.pdf Mustapa, Maizatul Akmam (2015) Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa. Degree thesis, Universiti Teknologi MARA.
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Melaka
Programming. Rule-based programming. Backtrack programming
spellingShingle Melaka
Programming. Rule-based programming. Backtrack programming
Mustapa, Maizatul Akmam
Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
description The final exam invigilation schedule in UiTM Malacca Jasin campus is prepared by UiTM Pulau Pinang Scheduling System, where all the factors and information of lecturers’ constraint being sent there by the Examination Unit. There is always a delay in waiting for the invigilation schedule to be announced. If there are any changes of the schedule after the schedule is generated, the schedule will not be updated in the system. The schedule changing process is done manually by form. The Exam Invigilation Scheduling System aims to own a scheduling system in the campus and reduce the time used in creating the invigilation schedule. To solve the invigilation scheduling problem, constraint based technique with rule based approach is used to find the optimal solution. Rule based technique is used in searching method and involve knowledge base as the data constraint store. In developing the project, software prototyping model was used which involves of the preliminary investigation, requirement definition, system design, system development, system testing and system prototype phase. Two interviews have been conducted as data collection method. The findings of the project include the system requirements and rules. There were ten rules involved in creating the invigilation schedule. The project does not assist in changing the invigilator assigned in the invigilation schedule. Thus, it is recommended to provide function that allows the application of schedule changes for future works.
format Thesis
author Mustapa, Maizatul Akmam
author_facet Mustapa, Maizatul Akmam
author_sort Mustapa, Maizatul Akmam
title Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
title_short Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
title_full Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
title_fullStr Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
title_full_unstemmed Exam invigilation scheduling system for UiTM Malacca Jasin Campus / Maizatul Akmam Mustapa
title_sort exam invigilation scheduling system for uitm malacca jasin campus / maizatul akmam mustapa
publishDate 2015
url http://ir.uitm.edu.my/id/eprint/14532/
http://ir.uitm.edu.my/id/eprint/14532/1/TD_MAIZATUL%20AKMAM%20MUSTAPA%20CS%2015_5.pdf
first_indexed 2023-09-18T22:51:50Z
last_indexed 2023-09-18T22:51:50Z
_version_ 1777417596053749760