A study on construction using cofferdam method in coastal area case study: Kota Kinabalu City / Rafflesia Sombuling

This paper presents an overview of the present state of construction of cofferdam techniques with special emphasis and a brief on other techniques developed world over for mitigating hydraulic forces on the temporary structures.A cofferdam is a temporary structure designed to keep water and soil out...

Full description

Bibliographic Details
Main Author: Sombuling, Rafflesia
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/15413/
http://ir.uitm.edu.my/id/eprint/15413/1/TM_RAFFLESIA%20SOMBULING%20AP%2015_5.pdf
id uitm-15413
recordtype eprints
spelling uitm-154132016-11-23T06:28:24Z http://ir.uitm.edu.my/id/eprint/15413/ A study on construction using cofferdam method in coastal area case study: Kota Kinabalu City / Rafflesia Sombuling Sombuling, Rafflesia Malaysia Malaysia This paper presents an overview of the present state of construction of cofferdam techniques with special emphasis and a brief on other techniques developed world over for mitigating hydraulic forces on the temporary structures.A cofferdam is a temporary structure designed to keep water and soil out of the excavation in which a bridge pier or other structure is built. When construction must take place below the water level, a cofferdam is built to give workers a dry work environment.Sheet piling is driven around the work site, seal concrete is placed into the bottom to prevent water from seeping in from underneath the sheet piling, and the water is pumped out. There are different types of cofferdam, some are used to support excavation operation and some are enclosed type box placed in the water.The present case study deals with step by step procedure adopted at Sabah International Convention Centre and Jesselton Residence which is both located at Kota Kinabalu Sabah. It depicts the intricacy of the management of the work at site and gives lot of insights to such similar works involving details of bentonite slurry, rock bund, planning and execution of interlocking sheet piles, reinforcement, concreting, plants and equipment, safety procedures to be adopted for the construction of cofferdam. 2015 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/15413/1/TM_RAFFLESIA%20SOMBULING%20AP%2015_5.pdf Sombuling, Rafflesia (2015) A study on construction using cofferdam method in coastal area case study: Kota Kinabalu City / Rafflesia Sombuling. Masters thesis, Universiti Teknologi MARA.
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Malaysia
Malaysia
spellingShingle Malaysia
Malaysia
Sombuling, Rafflesia
A study on construction using cofferdam method in coastal area case study: Kota Kinabalu City / Rafflesia Sombuling
description This paper presents an overview of the present state of construction of cofferdam techniques with special emphasis and a brief on other techniques developed world over for mitigating hydraulic forces on the temporary structures.A cofferdam is a temporary structure designed to keep water and soil out of the excavation in which a bridge pier or other structure is built. When construction must take place below the water level, a cofferdam is built to give workers a dry work environment.Sheet piling is driven around the work site, seal concrete is placed into the bottom to prevent water from seeping in from underneath the sheet piling, and the water is pumped out. There are different types of cofferdam, some are used to support excavation operation and some are enclosed type box placed in the water.The present case study deals with step by step procedure adopted at Sabah International Convention Centre and Jesselton Residence which is both located at Kota Kinabalu Sabah. It depicts the intricacy of the management of the work at site and gives lot of insights to such similar works involving details of bentonite slurry, rock bund, planning and execution of interlocking sheet piles, reinforcement, concreting, plants and equipment, safety procedures to be adopted for the construction of cofferdam.
format Thesis
author Sombuling, Rafflesia
author_facet Sombuling, Rafflesia
author_sort Sombuling, Rafflesia
title A study on construction using cofferdam method in coastal area case study: Kota Kinabalu City / Rafflesia Sombuling
title_short A study on construction using cofferdam method in coastal area case study: Kota Kinabalu City / Rafflesia Sombuling
title_full A study on construction using cofferdam method in coastal area case study: Kota Kinabalu City / Rafflesia Sombuling
title_fullStr A study on construction using cofferdam method in coastal area case study: Kota Kinabalu City / Rafflesia Sombuling
title_full_unstemmed A study on construction using cofferdam method in coastal area case study: Kota Kinabalu City / Rafflesia Sombuling
title_sort study on construction using cofferdam method in coastal area case study: kota kinabalu city / rafflesia sombuling
publishDate 2015
url http://ir.uitm.edu.my/id/eprint/15413/
http://ir.uitm.edu.my/id/eprint/15413/1/TM_RAFFLESIA%20SOMBULING%20AP%2015_5.pdf
first_indexed 2023-09-18T22:53:47Z
last_indexed 2023-09-18T22:53:47Z
_version_ 1777417718593486848