Labour management of construction site (labour welfare) / Nurul Salwani Noor Yakim
Construction site is a place specially prepared to carry out activities of a project. Construction site is a place that has the potential to occur any accident or minor accidents such as slipping or injury. To make sure labour management at construction site is carried out accordance to legal requi...
Main Author: | Noor Yakim, Nurul Salwani |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Architecture, Planning and Surveying
2010
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/15529/ http://ir.uitm.edu.my/id/eprint/15529/1/PPb_NURUL%20SALWANI%20NOOR%20YAKIM%20AP%2010_5.PDF |
Similar Items
-
The Malay labourer by the window of capitalism
by: Zawawi Ibrahim
Published: (1998) -
Foreign labour Malaysia immigration policy and impacts to economic security
by: Azaman bin Jaafar
Published: (2016) -
A Handbook of Malaysian labour laws
by: D'Cruz
Published: (2003) -
Guide to the employment act & the labour laws of Malaysia
by: GOH
Published: (1992) -
Local skilled labour shortage in Malaysia construction industry / Nur Farahin Sujarni
by: Sujarni, Nur Farahin
Published: (2015)