Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin

Completion of construction project on time is an important key of successful. Late completion of works on time is defined as delay. Nowadays,delays are one of the huge problems facing by the construction industry. The delay in construction project gives many consequences and also gives impact to th...

Full description

Bibliographic Details
Main Author: Mohd Tarjuddin, Muhammad Faiz
Format: Student Project
Language:English
Published: Faculty of Architecture , Planning and Surveying 2015
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/15654/
http://ir.uitm.edu.my/id/eprint/15654/1/TD_MUHAMMAD%20FAIZ%20MOHD%20TARJUDDIN%20AP%2015_5.PDF
id uitm-15654
recordtype eprints
spelling uitm-156542017-01-13T02:09:59Z http://ir.uitm.edu.my/id/eprint/15654/ Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin Mohd Tarjuddin, Muhammad Faiz Malaysia Construction by phase of the work (Building trades) Completion of construction project on time is an important key of successful. Late completion of works on time is defined as delay. Nowadays,delays are one of the huge problems facing by the construction industry. The delay in construction project gives many consequences and also gives impact to the involved parties.The three main objectives of this study are to examine the causes of delay on the construction projects, to recognize the effects and consequences of construction delays and to recommend the ways to reduce construction delays in development.A complete literature was conducted to build up general understanding and knowledge to identify this causes and effects. A questionnaire survey and interview was conducted in order to identify these issues involving the respondents from clients, contractors and consultants. About 48 respondents participated in the survey.The data analysis from the survey then has been ranked based on their mean. There are thirty one delay causes in the questionnaire survey that has been identified. The causes have been grouped in 9 categories which were project, client, contractor, consultant, design, material,equipment, labour and external factors. The proposed methods also have been recognized in order to solve and minimize the delay problem in construction industry. Faculty of Architecture , Planning and Surveying 2015 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/15654/1/TD_MUHAMMAD%20FAIZ%20MOHD%20TARJUDDIN%20AP%2015_5.PDF Mohd Tarjuddin, Muhammad Faiz (2015) Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin. [Student Project] (Unpublished)
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Malaysia
Construction by phase of the work (Building trades)
spellingShingle Malaysia
Construction by phase of the work (Building trades)
Mohd Tarjuddin, Muhammad Faiz
Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin
description Completion of construction project on time is an important key of successful. Late completion of works on time is defined as delay. Nowadays,delays are one of the huge problems facing by the construction industry. The delay in construction project gives many consequences and also gives impact to the involved parties.The three main objectives of this study are to examine the causes of delay on the construction projects, to recognize the effects and consequences of construction delays and to recommend the ways to reduce construction delays in development.A complete literature was conducted to build up general understanding and knowledge to identify this causes and effects. A questionnaire survey and interview was conducted in order to identify these issues involving the respondents from clients, contractors and consultants. About 48 respondents participated in the survey.The data analysis from the survey then has been ranked based on their mean. There are thirty one delay causes in the questionnaire survey that has been identified. The causes have been grouped in 9 categories which were project, client, contractor, consultant, design, material,equipment, labour and external factors. The proposed methods also have been recognized in order to solve and minimize the delay problem in construction industry.
format Student Project
author Mohd Tarjuddin, Muhammad Faiz
author_facet Mohd Tarjuddin, Muhammad Faiz
author_sort Mohd Tarjuddin, Muhammad Faiz
title Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin
title_short Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin
title_full Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin
title_fullStr Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin
title_full_unstemmed Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin
title_sort cause and effect of construction delay (bumiputera company) / muhammad faiz mohd tarjuddin
publisher Faculty of Architecture , Planning and Surveying
publishDate 2015
url http://ir.uitm.edu.my/id/eprint/15654/
http://ir.uitm.edu.my/id/eprint/15654/1/TD_MUHAMMAD%20FAIZ%20MOHD%20TARJUDDIN%20AP%2015_5.PDF
first_indexed 2023-09-18T22:54:20Z
last_indexed 2023-09-18T22:54:20Z
_version_ 1777417753449201664