Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang

Vandalism and theft are important issues relating to the construction site. Incidents of vandalism and theft sometimes depending on the type of construction work and this varies between road and highway construction, housing construction , airport , dam structure , and also the construction of the s...

Full description

Bibliographic Details
Main Author: Che Awang, Che Amirah
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2015
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/15985/
http://ir.uitm.edu.my/id/eprint/15985/1/PPb_CHE%20AMIRAH%20CHE%20AWANG%20AP%2015_5.pdf
id uitm-15985
recordtype eprints
spelling uitm-159852016-12-22T02:12:44Z http://ir.uitm.edu.my/id/eprint/15985/ Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang Che Awang, Che Amirah Malaysia Vandalism and theft are important issues relating to the construction site. Incidents of vandalism and theft sometimes depending on the type of construction work and this varies between road and highway construction, housing construction , airport , dam structure , and also the construction of the stadium. Contractors always lose materials, tools and expensive equipment because theft and vandalism whether by site workers or criminals who recognize an easy opportunity. The total losses from vandalism and theft on construction sites have been increasing dramatically over the past decade. The objective of this study is to study the risk management in construction to investigate the causes and effect of theft and vandalism problem construction site, to carry out recommendation the preventive measure to reduce theft and vandalism problems occur at construction site. To achieve the objective of this study, interview was conducted to get more detail information about the theft and vandalism problem and also the risk management in construction site. Besides that the questionnaire also distributed to the person that in charge the construction site. Faculty of Architecture, Planning and Surveying 2015 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/15985/1/PPb_CHE%20AMIRAH%20CHE%20AWANG%20AP%2015_5.pdf Che Awang, Che Amirah (2015) Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang. [Student Project] (Unpublished)
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Malaysia
spellingShingle Malaysia
Che Awang, Che Amirah
Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang
description Vandalism and theft are important issues relating to the construction site. Incidents of vandalism and theft sometimes depending on the type of construction work and this varies between road and highway construction, housing construction , airport , dam structure , and also the construction of the stadium. Contractors always lose materials, tools and expensive equipment because theft and vandalism whether by site workers or criminals who recognize an easy opportunity. The total losses from vandalism and theft on construction sites have been increasing dramatically over the past decade. The objective of this study is to study the risk management in construction to investigate the causes and effect of theft and vandalism problem construction site, to carry out recommendation the preventive measure to reduce theft and vandalism problems occur at construction site. To achieve the objective of this study, interview was conducted to get more detail information about the theft and vandalism problem and also the risk management in construction site. Besides that the questionnaire also distributed to the person that in charge the construction site.
format Student Project
author Che Awang, Che Amirah
author_facet Che Awang, Che Amirah
author_sort Che Awang, Che Amirah
title Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang
title_short Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang
title_full Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang
title_fullStr Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang
title_full_unstemmed Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang
title_sort risk management in construction – preventive measure to reduce theft and vandalism problem / che amirah che awang
publisher Faculty of Architecture, Planning and Surveying
publishDate 2015
url http://ir.uitm.edu.my/id/eprint/15985/
http://ir.uitm.edu.my/id/eprint/15985/1/PPb_CHE%20AMIRAH%20CHE%20AWANG%20AP%2015_5.pdf
first_indexed 2023-09-18T22:55:06Z
last_indexed 2023-09-18T22:55:06Z
_version_ 1777417800899362816