Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang
Vandalism and theft are important issues relating to the construction site. Incidents of vandalism and theft sometimes depending on the type of construction work and this varies between road and highway construction, housing construction , airport , dam structure , and also the construction of the s...
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Architecture, Planning and Surveying
2015
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/15985/ http://ir.uitm.edu.my/id/eprint/15985/1/PPb_CHE%20AMIRAH%20CHE%20AWANG%20AP%2015_5.pdf |
id |
uitm-15985 |
---|---|
recordtype |
eprints |
spelling |
uitm-159852016-12-22T02:12:44Z http://ir.uitm.edu.my/id/eprint/15985/ Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang Che Awang, Che Amirah Malaysia Vandalism and theft are important issues relating to the construction site. Incidents of vandalism and theft sometimes depending on the type of construction work and this varies between road and highway construction, housing construction , airport , dam structure , and also the construction of the stadium. Contractors always lose materials, tools and expensive equipment because theft and vandalism whether by site workers or criminals who recognize an easy opportunity. The total losses from vandalism and theft on construction sites have been increasing dramatically over the past decade. The objective of this study is to study the risk management in construction to investigate the causes and effect of theft and vandalism problem construction site, to carry out recommendation the preventive measure to reduce theft and vandalism problems occur at construction site. To achieve the objective of this study, interview was conducted to get more detail information about the theft and vandalism problem and also the risk management in construction site. Besides that the questionnaire also distributed to the person that in charge the construction site. Faculty of Architecture, Planning and Surveying 2015 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/15985/1/PPb_CHE%20AMIRAH%20CHE%20AWANG%20AP%2015_5.pdf Che Awang, Che Amirah (2015) Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang. [Student Project] (Unpublished) |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Teknologi MARA |
building |
UiTM Institutional Repository |
collection |
Online Access |
language |
English |
topic |
Malaysia |
spellingShingle |
Malaysia Che Awang, Che Amirah Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang |
description |
Vandalism and theft are important issues relating to the construction site. Incidents of vandalism and theft sometimes depending on the type of construction work and this varies between road and highway construction, housing construction , airport , dam structure , and also the construction of the stadium. Contractors always lose materials, tools and expensive equipment because theft and vandalism whether by site workers or criminals who recognize an easy opportunity. The total losses from vandalism and theft on construction sites have been increasing dramatically over the past decade. The objective of this study is to study the risk management in construction to investigate the causes and effect of theft and vandalism problem
construction site, to carry out recommendation the preventive measure to reduce theft and vandalism problems occur at construction site. To achieve the objective of this study, interview was conducted to get more detail information about the theft and vandalism problem and also the risk management in construction site. Besides that the questionnaire also distributed to the person that in charge the construction site. |
format |
Student Project |
author |
Che Awang, Che Amirah |
author_facet |
Che Awang, Che Amirah |
author_sort |
Che Awang, Che Amirah |
title |
Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang |
title_short |
Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang |
title_full |
Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang |
title_fullStr |
Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang |
title_full_unstemmed |
Risk management in construction – preventive measure to reduce theft and vandalism problem / Che Amirah Che Awang |
title_sort |
risk management in construction – preventive measure to reduce theft and vandalism problem / che amirah che awang |
publisher |
Faculty of Architecture, Planning and Surveying |
publishDate |
2015 |
url |
http://ir.uitm.edu.my/id/eprint/15985/ http://ir.uitm.edu.my/id/eprint/15985/1/PPb_CHE%20AMIRAH%20CHE%20AWANG%20AP%2015_5.pdf |
first_indexed |
2023-09-18T22:55:06Z |
last_indexed |
2023-09-18T22:55:06Z |
_version_ |
1777417800899362816 |