Experience in stabilisation of rock slopes in Pahang / Muhammad Hafeez Osman … [et al.]
Two cases regarding the histories of rock slopes repair and stabilisation of unstable boulder along Bukit Cincin to Genting Highlands and along the road from Gap to Fraser Hill in Pahang are presented. On 30th October 1997, 10 locations of road failure occurred along the road from Bukit Cincin to Ge...
Main Author: | Osman, Muhammad Hafeez |
---|---|
Format: | Article |
Language: | English |
Published: |
Universiti Teknologi MARA, Pulau Pinang & Pusat Penerbitan Universiti (UPENA)
2009
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/16284/ http://ir.uitm.edu.my/id/eprint/16284/2/AJ_MUHAMMAD%20HAFEEZ%20OSMAN%20ESTEEM%2009.pdf |
Similar Items
-
Geophysical characterisation of meta-sedimentary interbeded rock for geotechnical works / Haryati Awang
by: Awang, Haryati
Published: (2010) -
Rock abrasivity using cerchar abrasivity index (CAI) as an alternative to rock material characterization / Noorul Iqhlima Najwa Ismail
by: Ismail, Noorul Iqhlima Najwa
Published: (2014) -
Slope risk assessment using GIS technique: study area - section U10 Shah Alam, Selangor / Shamiruddin Mahammad Azami
by: Mahammad Azami, Shamiruddin
Published: (2009) -
Bearing capacity of interbedded weak sedimentary rock / Kamaruzzaman Mohamed
by: Mohamed, Kamaruzzaman
Published: (2010) -
Comparison between hydrated lime dry powder and slurry on peat soil stabilization / Anas Ibrahim … [et al.]
by: Ibrahim, Anas, et al.
Published: (2007)