A study on the defect liability on low cost housing / Mohammad Azlin Hamat
According to a statement issued by the Ministry of Finance Malaysia, the period of defective liability is a period which the contractor must repair any defects identified by supervisors after completion of the work certified. All defect repair expenses shall be borne by the contractor and no additio...
| Main Author: | |
|---|---|
| Format: | Student Project |
| Language: | English |
| Published: |
Faculty of Architecture, Planning and Surveying
2013
|
| Online Access: | http://ir.uitm.edu.my/id/eprint/16545/ http://ir.uitm.edu.my/id/eprint/16545/1/PPb_MOHAMMAD%20AZLIN%20HAMAT%20AP%2013_5.pdf |