A study on the defect liability on low cost housing / Mohammad Azlin Hamat
According to a statement issued by the Ministry of Finance Malaysia, the period of defective liability is a period which the contractor must repair any defects identified by supervisors after completion of the work certified. All defect repair expenses shall be borne by the contractor and no additio...
| Main Author: | Hamat, Mohammad Azlin |
|---|---|
| Format: | Student Project |
| Language: | English |
| Published: |
Faculty of Architecture, Planning and Surveying
2013
|
| Online Access: | http://ir.uitm.edu.my/id/eprint/16545/ http://ir.uitm.edu.my/id/eprint/16545/1/PPb_MOHAMMAD%20AZLIN%20HAMAT%20AP%2013_5.pdf |
Similar Items
-
Defect study during defect liability period / Mohd Asrul Hassin
by: Hassin, Mohd Asrul
Published: (2010) -
Study on housing defect in Malaysia
by: Nor Hidayu, Norazham
Published: (2017) -
Foreclosure of landed-properties in Kelantan with reference
to the Kelantan Malay reservation enactment / Abdul Hadi Awang Hamat
by: Awang Hamat, Abdul Hadi
Published: (1994) -
A survey on occupants’ satisfaction in the design of public low-cost housing in Selangor / Mohammad Amram Awang Omar
by: Awang Omar, Mohammad Amram
Published: (2013) -
Research on digital story book for Dyslexia learning: basic context of Bahasa Melayu / Syafiqah Hilwani Hamat@Mustafa
by: Hamat@Mustafa, Syafiqah Hilwani
Published: (2018)