Tailor system using earliest due date scheduling technique / Suhailah Othman
Tailor System Using Earliest Due Date Scheduling Technique is about producing schedule to align the customer booking that include the time for and promise date from tailor for each customer. First of all, before producing this schedule, some data need to capture and analyzes like processing time for...
Main Author: | Suhailah, Othman |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2017
|
Online Access: | http://ir.uitm.edu.my/id/eprint/18304/ http://ir.uitm.edu.my/id/eprint/18304/1/TD_SUHAILAH%20OTHMAN%20CS%2017_5.pdf |
Similar Items
-
The earliest civilizations
by: OLIPHANT
Published: (1991) -
Effect of strength and stiffness distributions on the displacement demands of asymmetric reinforced concrete buildings / Suhailah Mohamed Noor
by: Mohamed Noor, Suhailah
Published: (2016) -
The earliest Waqf in Malaysia
by: Md Dahlan, Salehudin, et al.
Published: (2018) -
Pemuliharaan pendidikan rohaniyyah melalui pengajian islam / Suhailah Hj. Abd. Muin and Saharia Hj. Ismail
by: Hj. Abd. Muin, Suhailah, et al.
Published: (2016) -
The tailor of Panama
by: Le Carre 769;, John, 1931-
Published: (1996)