Impact of reduce tide from different tidal station to bathymetric survey using [multibeam] in Terengganu / Mohamad Imannudin Azman

Tide is very important component in bathymetry survey, this is because tide were used in bathymetry data processing to product the actual depth of the survey area. Inaccurate tidal data will end up with inaccurate water depth which is will effect the purpose of the survey. This project aim to study...

Full description

Bibliographic Details
Main Author: Azman, Mohamad Imannudin
Format: Thesis
Language:English
Published: 2018
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/21498/
http://ir.uitm.edu.my/id/eprint/21498/1/TD_MOHAMAD%20IMANNUDIN%20AZMAN%20AP%20R%2018_5.pdf
id uitm-21498
recordtype eprints
spelling uitm-214982018-09-06T08:40:22Z http://ir.uitm.edu.my/id/eprint/21498/ Impact of reduce tide from different tidal station to bathymetric survey using [multibeam] in Terengganu / Mohamad Imannudin Azman Azman, Mohamad Imannudin Ground and surface waters Water resources development Tide is very important component in bathymetry survey, this is because tide were used in bathymetry data processing to product the actual depth of the survey area. Inaccurate tidal data will end up with inaccurate water depth which is will effect the purpose of the survey. This project aim to study the impact of different reduce tide from different tidal station to a multibeam survey data which is based on the distance of the tidal station. The bathymetry data involved in this project were taken at Bidong Island, Terengganu which is under University Malaysia Terengganu (UMT) in cooperation with THSGeoscience company. This research consisted of tide observation data which is collect by automatic tide gauge at Bidong Island while survey conducted, and two other tide prediction which is generated by using harmonic constant of Chendering and Kuala Dungun tide station. Both selected tide station were chosen differently based on it distance to the survey area. These tide data were load into the same bathymetry separately in order to know the effect. From the result of the research, it is can be see that there was slight surface different between observation tide data to prediction tide data and there is not much different for both prediction data though it has different distance to the survey area. It is hope that this study will create an alert to the importance of tide station selection regarding to it distance from bathymetry survey area. 2018-09-06 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/21498/1/TD_MOHAMAD%20IMANNUDIN%20AZMAN%20AP%20R%2018_5.pdf Azman, Mohamad Imannudin (2018) Impact of reduce tide from different tidal station to bathymetric survey using [multibeam] in Terengganu / Mohamad Imannudin Azman. Degree thesis, Universiti Teknologi Mara Perlis.
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Ground and surface waters
Water resources development
spellingShingle Ground and surface waters
Water resources development
Azman, Mohamad Imannudin
Impact of reduce tide from different tidal station to bathymetric survey using [multibeam] in Terengganu / Mohamad Imannudin Azman
description Tide is very important component in bathymetry survey, this is because tide were used in bathymetry data processing to product the actual depth of the survey area. Inaccurate tidal data will end up with inaccurate water depth which is will effect the purpose of the survey. This project aim to study the impact of different reduce tide from different tidal station to a multibeam survey data which is based on the distance of the tidal station. The bathymetry data involved in this project were taken at Bidong Island, Terengganu which is under University Malaysia Terengganu (UMT) in cooperation with THSGeoscience company. This research consisted of tide observation data which is collect by automatic tide gauge at Bidong Island while survey conducted, and two other tide prediction which is generated by using harmonic constant of Chendering and Kuala Dungun tide station. Both selected tide station were chosen differently based on it distance to the survey area. These tide data were load into the same bathymetry separately in order to know the effect. From the result of the research, it is can be see that there was slight surface different between observation tide data to prediction tide data and there is not much different for both prediction data though it has different distance to the survey area. It is hope that this study will create an alert to the importance of tide station selection regarding to it distance from bathymetry survey area.
format Thesis
author Azman, Mohamad Imannudin
author_facet Azman, Mohamad Imannudin
author_sort Azman, Mohamad Imannudin
title Impact of reduce tide from different tidal station to bathymetric survey using [multibeam] in Terengganu / Mohamad Imannudin Azman
title_short Impact of reduce tide from different tidal station to bathymetric survey using [multibeam] in Terengganu / Mohamad Imannudin Azman
title_full Impact of reduce tide from different tidal station to bathymetric survey using [multibeam] in Terengganu / Mohamad Imannudin Azman
title_fullStr Impact of reduce tide from different tidal station to bathymetric survey using [multibeam] in Terengganu / Mohamad Imannudin Azman
title_full_unstemmed Impact of reduce tide from different tidal station to bathymetric survey using [multibeam] in Terengganu / Mohamad Imannudin Azman
title_sort impact of reduce tide from different tidal station to bathymetric survey using [multibeam] in terengganu / mohamad imannudin azman
publishDate 2018
url http://ir.uitm.edu.my/id/eprint/21498/
http://ir.uitm.edu.my/id/eprint/21498/1/TD_MOHAMAD%20IMANNUDIN%20AZMAN%20AP%20R%2018_5.pdf
first_indexed 2023-09-18T23:06:41Z
last_indexed 2023-09-18T23:06:41Z
_version_ 1777418529899806720