A framework of the economic factors and cost in the implementation of mechanisation and automation (M&A) in Industrialised Building System (IBS) approach / Siti Syariazulfa Kamaruddin
Industrialised Building System (IBS) has been introduced to promote a systematic construction process. The application of IBS offers numerous benefits such as cost, time reduction and enhancing construction quality and safety. In the Malaysian construction industry, IBS application was also expected...
Main Author: | Kamaruddin, Siti Syariazulfa |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Institute of Graduate Studies, UiTM
2018
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/22016/ http://ir.uitm.edu.my/id/eprint/22016/1/ABS_SITI%20SYARIAZULFA%20KAMARUDDIN%20TDRA%20VOL%2014%20IGS%2018.pdf |
Similar Items
-
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013) -
Construction quality of school buildings using the Industrialised Building System (IBS)
by: Ali, Maisarah, et al.
Published: (2012) -
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010) -
Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail
by: Ismail, Muhammad Aizat
Published: (2012) -
The implementation of industrialised building system in construction industry
by: Mohd Syazwan Nizam, Mohd Moni
Published: (2012)