Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin
This study focused on the development of a computer program for monitoring of soil nailing in construction field by using a Microsoft Access database system. The monitoring of soil nailing in the construction field will be systematic by using the Microsoft Access database system. In this project,...
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Civil Engineering
2006
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/25545/ http://ir.uitm.edu.my/id/eprint/25545/1/PPb_MAHERAN%20ZAINUDDIN%20EC%20P%2006_5..pdf |
id |
uitm-25545 |
---|---|
recordtype |
eprints |
spelling |
uitm-255452019-09-20T03:28:53Z http://ir.uitm.edu.my/id/eprint/25545/ Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin Zainuddin, Maheran Engineering geology. Rock mechanics. Soil mechanics. This study focused on the development of a computer program for monitoring of soil nailing in construction field by using a Microsoft Access database system. The monitoring of soil nailing in the construction field will be systematic by using the Microsoft Access database system. In this project, the material, machinery, manpower and money aspect (4M) will be monitored by using this system. The data from the site in this project will be collected and key- in in the Microsoft Access database system that was being developed. In this project, a database system will be monitoring their usage, quantity, and cost, finished work on that day or other days. From this system we can reduce the entire item and also know the schedule of the work every time we want. We will use a wizard to rapidly create the structure for a sophisticated contact management database, complete with tables, queries, forms and reports. After exploring this database and entering a few records to get an idea of what a wizard can provide in the way of a starting point, we will discard this database and start working on monitoring the soil nailing. This system is a systematic method in collecting data and minimizes the material, man power, machinery and also the money in soil nailing in construction engineering. Faculty of Civil Engineering 2006-11-15 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/25545/1/PPb_MAHERAN%20ZAINUDDIN%20EC%20P%2006_5..pdf Zainuddin, Maheran (2006) Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin. [Student Project] (Unpublished) |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Teknologi MARA |
building |
UiTM Institutional Repository |
collection |
Online Access |
language |
English |
topic |
Engineering geology. Rock mechanics. Soil mechanics. |
spellingShingle |
Engineering geology. Rock mechanics. Soil mechanics. Zainuddin, Maheran Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin |
description |
This study focused on the development of a computer program for monitoring of soil
nailing in construction field by using a Microsoft Access database system. The
monitoring of soil nailing in the construction field will be systematic by using the
Microsoft Access database system. In this project, the material, machinery, manpower
and money aspect (4M) will be monitored by using this system. The data from the site in
this project will be collected and key- in in the Microsoft Access database system that
was being developed. In this project, a database system will be monitoring their usage,
quantity, and cost, finished work on that day or other days. From this system we can
reduce the entire item and also know the schedule of the work every time we want. We
will use a wizard to rapidly create the structure for a sophisticated contact management
database, complete with tables, queries, forms and reports. After exploring this database
and entering a few records to get an idea of what a wizard can provide in the way of a
starting point, we will discard this database and start working on monitoring the soil
nailing. This system is a systematic method in collecting data and minimizes the
material, man power, machinery and also the money in soil nailing in construction
engineering. |
format |
Student Project |
author |
Zainuddin, Maheran |
author_facet |
Zainuddin, Maheran |
author_sort |
Zainuddin, Maheran |
title |
Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin |
title_short |
Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin |
title_full |
Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin |
title_fullStr |
Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin |
title_full_unstemmed |
Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin |
title_sort |
monitoring construction of soil nailing using microsoft access / maheran zainuddin |
publisher |
Faculty of Civil Engineering |
publishDate |
2006 |
url |
http://ir.uitm.edu.my/id/eprint/25545/ http://ir.uitm.edu.my/id/eprint/25545/1/PPb_MAHERAN%20ZAINUDDIN%20EC%20P%2006_5..pdf |
first_indexed |
2023-09-18T23:14:57Z |
last_indexed |
2023-09-18T23:14:57Z |
_version_ |
1777419049987211264 |