Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin

This study focused on the development of a computer program for monitoring of soil nailing in construction field by using a Microsoft Access database system. The monitoring of soil nailing in the construction field will be systematic by using the Microsoft Access database system. In this project,...

Full description

Bibliographic Details
Main Author: Zainuddin, Maheran
Format: Student Project
Language:English
Published: Faculty of Civil Engineering 2006
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/25545/
http://ir.uitm.edu.my/id/eprint/25545/1/PPb_MAHERAN%20ZAINUDDIN%20EC%20P%2006_5..pdf
id uitm-25545
recordtype eprints
spelling uitm-255452019-09-20T03:28:53Z http://ir.uitm.edu.my/id/eprint/25545/ Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin Zainuddin, Maheran Engineering geology. Rock mechanics. Soil mechanics. This study focused on the development of a computer program for monitoring of soil nailing in construction field by using a Microsoft Access database system. The monitoring of soil nailing in the construction field will be systematic by using the Microsoft Access database system. In this project, the material, machinery, manpower and money aspect (4M) will be monitored by using this system. The data from the site in this project will be collected and key- in in the Microsoft Access database system that was being developed. In this project, a database system will be monitoring their usage, quantity, and cost, finished work on that day or other days. From this system we can reduce the entire item and also know the schedule of the work every time we want. We will use a wizard to rapidly create the structure for a sophisticated contact management database, complete with tables, queries, forms and reports. After exploring this database and entering a few records to get an idea of what a wizard can provide in the way of a starting point, we will discard this database and start working on monitoring the soil nailing. This system is a systematic method in collecting data and minimizes the material, man power, machinery and also the money in soil nailing in construction engineering. Faculty of Civil Engineering 2006-11-15 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/25545/1/PPb_MAHERAN%20ZAINUDDIN%20EC%20P%2006_5..pdf Zainuddin, Maheran (2006) Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin. [Student Project] (Unpublished)
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Engineering geology. Rock mechanics. Soil mechanics.
spellingShingle Engineering geology. Rock mechanics. Soil mechanics.
Zainuddin, Maheran
Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin
description This study focused on the development of a computer program for monitoring of soil nailing in construction field by using a Microsoft Access database system. The monitoring of soil nailing in the construction field will be systematic by using the Microsoft Access database system. In this project, the material, machinery, manpower and money aspect (4M) will be monitored by using this system. The data from the site in this project will be collected and key- in in the Microsoft Access database system that was being developed. In this project, a database system will be monitoring their usage, quantity, and cost, finished work on that day or other days. From this system we can reduce the entire item and also know the schedule of the work every time we want. We will use a wizard to rapidly create the structure for a sophisticated contact management database, complete with tables, queries, forms and reports. After exploring this database and entering a few records to get an idea of what a wizard can provide in the way of a starting point, we will discard this database and start working on monitoring the soil nailing. This system is a systematic method in collecting data and minimizes the material, man power, machinery and also the money in soil nailing in construction engineering.
format Student Project
author Zainuddin, Maheran
author_facet Zainuddin, Maheran
author_sort Zainuddin, Maheran
title Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin
title_short Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin
title_full Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin
title_fullStr Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin
title_full_unstemmed Monitoring construction of soil nailing using microsoft access / Maheran Zainuddin
title_sort monitoring construction of soil nailing using microsoft access / maheran zainuddin
publisher Faculty of Civil Engineering
publishDate 2006
url http://ir.uitm.edu.my/id/eprint/25545/
http://ir.uitm.edu.my/id/eprint/25545/1/PPb_MAHERAN%20ZAINUDDIN%20EC%20P%2006_5..pdf
first_indexed 2023-09-18T23:14:57Z
last_indexed 2023-09-18T23:14:57Z
_version_ 1777419049987211264