A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam

Growth in construction activities generates construction waste which is fast becoming a serious environmental problem with deadly consequences. Most of the construction and demolition waste in our country are not recycled but end up in landfills occupying valuable land not to mention the cost incurr...

Full description

Bibliographic Details
Main Author: Ramlam, Muhammad Taufiq
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2009
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/25774/
http://ir.uitm.edu.my/id/eprint/25774/1/PPb_MUHAMMAD%20TAUFIQ%20RAMLAM%20AP%2009_5.pdf
id uitm-25774
recordtype eprints
spelling uitm-257742019-09-25T07:38:48Z http://ir.uitm.edu.my/id/eprint/25774/ A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam Ramlam, Muhammad Taufiq Management of the construction site. Superintendence of building construction Growth in construction activities generates construction waste which is fast becoming a serious environmental problem with deadly consequences. Most of the construction and demolition waste in our country are not recycled but end up in landfills occupying valuable land not to mention the cost incurred in landfilling. In line with this, a study on the benefits of waste minimization, the types and source of construction waste generation and methods used to dispose waste materials was carried out. The scope of study covers to person in-charge at renovation work site on construction waste management such as contractor, site supervisor or skilled worker. The area of this study is confined at Kuala Langat District Council (MDKL), Klang Municipal Council (MPK) and Shah Alam City Council (MBSA). The study was carried out by questionnaire and also an interview. A total of 16 respondents have submitted the completed questionnaire. Data was analyzed using average relative index. From the study, the benefits of waste minimization are conservation of natural resources, reduce environmental Impacts, increase profit, Increase landfill life and achieve a cleaner and safer construction site. The most frequent of waste material produced at construction site are cement plaster, steel, boards, timber, brick and paint barrel which causes by activities or factors of construction/renovation work, maintenance work, demolition work, design and material handling. The methods of waste disposal are landfill, dumping, open air burning, recycling and reuse. Faculty of Architecture, Planning and Surveying 2009 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/25774/1/PPb_MUHAMMAD%20TAUFIQ%20RAMLAM%20AP%2009_5.pdf Ramlam, Muhammad Taufiq (2009) A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam. [Student Project] (Unpublished)
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Management of the construction site. Superintendence of building construction
spellingShingle Management of the construction site. Superintendence of building construction
Ramlam, Muhammad Taufiq
A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam
description Growth in construction activities generates construction waste which is fast becoming a serious environmental problem with deadly consequences. Most of the construction and demolition waste in our country are not recycled but end up in landfills occupying valuable land not to mention the cost incurred in landfilling. In line with this, a study on the benefits of waste minimization, the types and source of construction waste generation and methods used to dispose waste materials was carried out. The scope of study covers to person in-charge at renovation work site on construction waste management such as contractor, site supervisor or skilled worker. The area of this study is confined at Kuala Langat District Council (MDKL), Klang Municipal Council (MPK) and Shah Alam City Council (MBSA). The study was carried out by questionnaire and also an interview. A total of 16 respondents have submitted the completed questionnaire. Data was analyzed using average relative index. From the study, the benefits of waste minimization are conservation of natural resources, reduce environmental Impacts, increase profit, Increase landfill life and achieve a cleaner and safer construction site. The most frequent of waste material produced at construction site are cement plaster, steel, boards, timber, brick and paint barrel which causes by activities or factors of construction/renovation work, maintenance work, demolition work, design and material handling. The methods of waste disposal are landfill, dumping, open air burning, recycling and reuse.
format Student Project
author Ramlam, Muhammad Taufiq
author_facet Ramlam, Muhammad Taufiq
author_sort Ramlam, Muhammad Taufiq
title A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam
title_short A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam
title_full A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam
title_fullStr A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam
title_full_unstemmed A study on construction waste management (renovation work) / Muhammad Taufiq Ramlam
title_sort study on construction waste management (renovation work) / muhammad taufiq ramlam
publisher Faculty of Architecture, Planning and Surveying
publishDate 2009
url http://ir.uitm.edu.my/id/eprint/25774/
http://ir.uitm.edu.my/id/eprint/25774/1/PPb_MUHAMMAD%20TAUFIQ%20RAMLAM%20AP%2009_5.pdf
first_indexed 2023-09-18T23:15:27Z
last_indexed 2023-09-18T23:15:27Z
_version_ 1777419081511600128