To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan

Before setting up a chromium plating plant, it is necessary to study and analyse thoroughly the various process stages involved, for which each stage has different operating conditions to be employed. The important factors in setting up the plant are D.C. power sources available, tank material, tank...

Full description

Bibliographic Details
Main Authors: Abd. Ghani, Razali, Hasan, Mohd. Ramli
Format: Student Project
Language:English
Published: Faculty of Mechanical Engineering 1986
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/25883/
http://ir.uitm.edu.my/id/eprint/25883/1/PPb_RAZALI%20ABD%20GHANI%20EM%2086_5.pdf
id uitm-25883
recordtype eprints
spelling uitm-258832019-10-01T08:17:28Z http://ir.uitm.edu.my/id/eprint/25883/ To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan Abd. Ghani, Razali Hasan, Mohd. Ramli Production management. Operations management Before setting up a chromium plating plant, it is necessary to study and analyse thoroughly the various process stages involved, for which each stage has different operating conditions to be employed. The important factors in setting up the plant are D.C. power sources available, tank material, tank capacity, current density and operating temperature limitations, and the cost. Close attention should be put on each process stage because various problems may arise if the operating procedures and conditions no as established. Analysis has been made in details for setting up the plant as well as the processes and conditions involved during operation. Methods of stripping of defective electrodeposits and procedures in preparing the baths or solutions have been outlined. There are seven tanks made of perspex or acrylic sheet, each 3 mm. in thickness and 20 by 20 by 65 cm. in dimensions used in the plant. Each tank contains three sections for which one section (20 by 20 by 25 cm.) used for baths or solutions while the other two for rinsing purposes. A 10V, 0-1OA rectifier has been used in the plant as D.C. power source. A 1 kW electric immersion heater sheathed in fused quartz is used for heating the baths. Temperature control of the baths is done manually with the aids of thermometer. The cnemical compounds used are of laboratory grade. Faculty of Mechanical Engineering 1986 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/25883/1/PPb_RAZALI%20ABD%20GHANI%20EM%2086_5.pdf Abd. Ghani, Razali and Hasan, Mohd. Ramli (1986) To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan. [Student Project] (Unpublished)
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Production management. Operations management
spellingShingle Production management. Operations management
Abd. Ghani, Razali
Hasan, Mohd. Ramli
To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan
description Before setting up a chromium plating plant, it is necessary to study and analyse thoroughly the various process stages involved, for which each stage has different operating conditions to be employed. The important factors in setting up the plant are D.C. power sources available, tank material, tank capacity, current density and operating temperature limitations, and the cost. Close attention should be put on each process stage because various problems may arise if the operating procedures and conditions no as established. Analysis has been made in details for setting up the plant as well as the processes and conditions involved during operation. Methods of stripping of defective electrodeposits and procedures in preparing the baths or solutions have been outlined. There are seven tanks made of perspex or acrylic sheet, each 3 mm. in thickness and 20 by 20 by 65 cm. in dimensions used in the plant. Each tank contains three sections for which one section (20 by 20 by 25 cm.) used for baths or solutions while the other two for rinsing purposes. A 10V, 0-1OA rectifier has been used in the plant as D.C. power source. A 1 kW electric immersion heater sheathed in fused quartz is used for heating the baths. Temperature control of the baths is done manually with the aids of thermometer. The cnemical compounds used are of laboratory grade.
format Student Project
author Abd. Ghani, Razali
Hasan, Mohd. Ramli
author_facet Abd. Ghani, Razali
Hasan, Mohd. Ramli
author_sort Abd. Ghani, Razali
title To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan
title_short To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan
title_full To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan
title_fullStr To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan
title_full_unstemmed To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan
title_sort to set up a mini chrome plating plant in the material science laboratory / razali abd. ghani and mohd. ramli hasan
publisher Faculty of Mechanical Engineering
publishDate 1986
url http://ir.uitm.edu.my/id/eprint/25883/
http://ir.uitm.edu.my/id/eprint/25883/1/PPb_RAZALI%20ABD%20GHANI%20EM%2086_5.pdf
first_indexed 2023-09-18T23:15:42Z
last_indexed 2023-09-18T23:15:42Z
_version_ 1777419096969707520