Assessing water quality of Murum Reservoir halfway through impoundment
This paper reports the water quality of Murum Hydroelectric Reservoir, eight months after impoundment of the dam. A total of nine stations were selected in the reservoir. Temperature, pH, dissolved oxygen (DO), biochemical oxygen demand (BOD5), chlorophyll-a and total suspended solids (TSS) were stu...
Main Authors: | Angie Sapis, Lee, Nyanti, Ling, Teck Yee, Sim, Siong Fong, Jongkar Grinang |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Universiti Kebangsaan Malaysia
2017
|
Online Access: | http://journalarticle.ukm.my/11705/ http://journalarticle.ukm.my/11705/ http://journalarticle.ukm.my/11705/1/13%20Angie%20Sapis.pdf |
Similar Items
-
Water quality of Bakun Hydroelectric Dam Reservoir, Sarawak, Malaysia, during the construction of Murum dam / Lee Nyanti, Teck-Yee Ling and Theresa Muan
by: Lee, Nyanti, et al.
Published: (2015) -
Physicochemical parameters of Bakun Reservoir in Belaga, Sarawak, Malaysia,
13 months after reaching full supply level
by: Teck, Yee Ling, et al.
Published: (2016) -
Assessment of water quality of Batang Rajang at
Pelagus Area, Sarawak, Malaysia
by: Ling, Teck-Yee, et al.
Published: (2017) -
Water quality of rivers that flow into bakun hydroelectric dam reservoir, Sarawak, Malaysia / Teck-Yee Ling, Lee Nyanti and Annestasia Simbut John Masion
by: Teck-Yee, Ling, et al.
Published: (2015) -
Remote Sensing of Water Quality in the Valle de Bravo Reservoir, Mexico
by: World Bank
Published: (2021)