Budget overruns experienced on tertiary institutional building projects – recourse to the contractors’ related factors

This paper examined the contractors’ related factors that are causing budget overruns on tertiary institutional building (TIB) projects in south western part of Nigeria. Survey method was adopted and one hundred and twenty (120) questionnaires administered on the respondents. It was discovered th...

Full description

Bibliographic Details
Main Authors: Adedokun, O.A., Akinmusire, A.O., Abiola-Ogedengbe, D.
Format: Article
Language:English
Published: Penerbit Universiti Kebangsaan Malaysia 2019
Online Access:http://journalarticle.ukm.my/13669/
http://journalarticle.ukm.my/13669/
http://journalarticle.ukm.my/13669/1/287-1262-1-PB.pdf
id ukm-13669
recordtype eprints
spelling ukm-136692019-11-22T21:23:22Z http://journalarticle.ukm.my/13669/ Budget overruns experienced on tertiary institutional building projects – recourse to the contractors’ related factors Adedokun, O.A. Akinmusire, A.O. Abiola-Ogedengbe, D. This paper examined the contractors’ related factors that are causing budget overruns on tertiary institutional building (TIB) projects in south western part of Nigeria. Survey method was adopted and one hundred and twenty (120) questionnaires administered on the respondents. It was discovered that delay in delivery of materials to site, poor skills and experience of labour and financial problems, shortage of materials on site and lack of contractors’ staff on site were the bane of cost overrun experienced on construction projects. The study recommended adequate and timely planning in terms of providing schedule for ordering materials (both quantity and time) and the list of suppliers so as to avoid delay in delivery of materials to site. Experienced labours with adequate skills are to be used, while making readily available another source for financing the projects aside total dependency on monthly valuation to avoid financial difficulty. This study has served as eye opener to the critical CRF that should be accorded high priority to avert budget overruns. Penerbit Universiti Kebangsaan Malaysia 2019 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/13669/1/287-1262-1-PB.pdf Adedokun, O.A. and Akinmusire, A.O. and Abiola-Ogedengbe, D. (2019) Budget overruns experienced on tertiary institutional building projects – recourse to the contractors’ related factors. Journal of Building Performance, 10 (1). pp. 79-84. ISSN 2180-2106 http://spaj.ukm.my/jsb/index.php/jbp/issue/view/46
repository_type Digital Repository
institution_category Local University
institution Universiti Kebangasaan Malaysia
building UKM Institutional Repository
collection Online Access
language English
description This paper examined the contractors’ related factors that are causing budget overruns on tertiary institutional building (TIB) projects in south western part of Nigeria. Survey method was adopted and one hundred and twenty (120) questionnaires administered on the respondents. It was discovered that delay in delivery of materials to site, poor skills and experience of labour and financial problems, shortage of materials on site and lack of contractors’ staff on site were the bane of cost overrun experienced on construction projects. The study recommended adequate and timely planning in terms of providing schedule for ordering materials (both quantity and time) and the list of suppliers so as to avoid delay in delivery of materials to site. Experienced labours with adequate skills are to be used, while making readily available another source for financing the projects aside total dependency on monthly valuation to avoid financial difficulty. This study has served as eye opener to the critical CRF that should be accorded high priority to avert budget overruns.
format Article
author Adedokun, O.A.
Akinmusire, A.O.
Abiola-Ogedengbe, D.
spellingShingle Adedokun, O.A.
Akinmusire, A.O.
Abiola-Ogedengbe, D.
Budget overruns experienced on tertiary institutional building projects – recourse to the contractors’ related factors
author_facet Adedokun, O.A.
Akinmusire, A.O.
Abiola-Ogedengbe, D.
author_sort Adedokun, O.A.
title Budget overruns experienced on tertiary institutional building projects – recourse to the contractors’ related factors
title_short Budget overruns experienced on tertiary institutional building projects – recourse to the contractors’ related factors
title_full Budget overruns experienced on tertiary institutional building projects – recourse to the contractors’ related factors
title_fullStr Budget overruns experienced on tertiary institutional building projects – recourse to the contractors’ related factors
title_full_unstemmed Budget overruns experienced on tertiary institutional building projects – recourse to the contractors’ related factors
title_sort budget overruns experienced on tertiary institutional building projects – recourse to the contractors’ related factors
publisher Penerbit Universiti Kebangsaan Malaysia
publishDate 2019
url http://journalarticle.ukm.my/13669/
http://journalarticle.ukm.my/13669/
http://journalarticle.ukm.my/13669/1/287-1262-1-PB.pdf
first_indexed 2023-09-18T20:05:22Z
last_indexed 2023-09-18T20:05:22Z
_version_ 1777407122723569664