Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
Current studies shows that most of the Industrialised Building System (IBS) project procurement or delivery methods in Malaysia are still based on the traditional approach. This traditional construction process has been widely criticized for its fragmented approach to project delivery and its fail...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English English |
Published: |
Construction Research Institute of Malaysia
2014
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/10227/ http://umpir.ump.edu.my/id/eprint/10227/ http://umpir.ump.edu.my/id/eprint/10227/1/Improving%20Integrated%20Practice%20through%20Building%20Information%20Modeling-Integrated%20Project%20Delivery%20%28BIM-IPD%29%20for%20Malaysian%20Industrialised%20Building%20System%20%28IBS%29%20Construction%20Projects.pdf http://umpir.ump.edu.my/id/eprint/10227/6/fkasa-2015-tarmizi-Improving%20Integrated%20practice%20through.pdf |
Summary: | Current studies shows that most of the Industrialised Building System (IBS) project procurement or delivery
methods in Malaysia are still based on the traditional approach. This traditional construction process has been
widely criticized for its fragmented approach to project delivery and its failure to form effective teams. Due to
that problem, a number of issues have recently arisen in current construction methods, such as reworks, time
delay, rising costs, lack of communication and coordination, and wastages. This paper through literature review aims to explore this fragmentation issue thus effects to the Malaysian IBS construction projects especially during the design and construction stages. Suggestion on how an integrated approach such as Building
Information Modelling (BIM) and Integrated Project Delivery (IPD) can contribute for design and construction
process in order to minimise the fragmentation issue will be concluded. |
---|