Case study on delay factors in steel bridge construction
Delay in construction is a norm in certain instances especially in large complex construction projects. With different kinds of delay causing different length of delays to the completion date of the project make it a real deal that needs attention by the authorities and the construction parties. Del...
Main Author: | Hazim Adly Harun, Harun |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/10843/ http://umpir.ump.edu.my/id/eprint/10843/ http://umpir.ump.edu.my/id/eprint/10843/1/HAZIM%20ADLY%20HARUN%20BIN%20HARUN.PDF |
Similar Items
-
The factors and effect of delay in government construction project (case study in Kuantan)
by: Mohd Rosazuwad, Mohamad@Muda
Published: (2010) -
The analysis of factors contributed to delay and method to analyze the delay in construction project
by: Mohammad Solhi, Mohammed
Published: (2010) -
A study on the factor effecting project delay in the housing construction
by: Fatin Fazlinda, Hamzah
Published: (2016) -
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014) -
Causes of time delay in construction Sarawak, Malaysia
by: Harrison Yan, Rolland Duat
Published: (2014)