The water resistance of interlocking block wall

Water that absorbed by block will make the strength of the block decreased. When external walls are exposed to water from different sources such as rain and flood water will enter the building, travelling from outer walls into internal walls. The water may lead to cracks in bricks and lead the the b...

Full description

Bibliographic Details
Main Author: Mohamad Aizuddin, Kamar
Format: Undergraduates Project Papers
Language:English
English
English
Published: 2015
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/11911/
http://umpir.ump.edu.my/id/eprint/11911/
http://umpir.ump.edu.my/id/eprint/11911/1/FKKSA%20-%20MOHAMAD%20AIZUDDIN%20BIN%20KAMAR%20%28CD9302%29.pdf
http://umpir.ump.edu.my/id/eprint/11911/2/FKKSA%20-%20MOHAMAD%20AIZUDDIN%20BIN%20KAMAR%20%28CD9302%29%20-%20CHAP%203.pdf
http://umpir.ump.edu.my/id/eprint/11911/3/FKKSA%20-%20MOHAMAD%20AIZUDDIN%20BIN%20KAMAR%20%28CD9302%29%20-%20CHAP%201.pdf
id ump-11911
recordtype eprints
spelling ump-119112016-03-14T04:04:20Z http://umpir.ump.edu.my/id/eprint/11911/ The water resistance of interlocking block wall Mohamad Aizuddin, Kamar TA Engineering (General). Civil engineering (General) Water that absorbed by block will make the strength of the block decreased. When external walls are exposed to water from different sources such as rain and flood water will enter the building, travelling from outer walls into internal walls. The water may lead to cracks in bricks and lead the the building collapse. If the weather conditions did not change, it may just mean that the walls stay damp without getting the opportunity to dry out. The objectives of this proposed topic are to test compressive strength of the blocks, to study the porosity of interlocking block and most importantly, to test the water resistance of the interlocking block wall with three different conditions that is normal block wall, block wall with mortar as infill and block wall added with grout around the block. The method for porosity test,is by using vacuum saturation method. The test for block wall is by pouring the interlocking block wall with water. The porosity for normal block is with 16.03 % while for the block with mortar as infill, 10.98 %. The block wall with assemble grout around the block is the best water resistance among the three interlocking block wall. This grouted wall take 39 minutes for the water to pass through all the blocks. The poorest water resistance is normal block wall that take only 17 minutes for the water to pass through the wall. This research can conclude that the type of assemble on the interlocking block wall affected the time for the water to went through the wall. 2015-07 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/11911/1/FKKSA%20-%20MOHAMAD%20AIZUDDIN%20BIN%20KAMAR%20%28CD9302%29.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/11911/2/FKKSA%20-%20MOHAMAD%20AIZUDDIN%20BIN%20KAMAR%20%28CD9302%29%20-%20CHAP%203.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/11911/3/FKKSA%20-%20MOHAMAD%20AIZUDDIN%20BIN%20KAMAR%20%28CD9302%29%20-%20CHAP%201.pdf Mohamad Aizuddin, Kamar (2015) The water resistance of interlocking block wall. Faculty of Civil Engineering & Earth Resources, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:92251&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
English
English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Mohamad Aizuddin, Kamar
The water resistance of interlocking block wall
description Water that absorbed by block will make the strength of the block decreased. When external walls are exposed to water from different sources such as rain and flood water will enter the building, travelling from outer walls into internal walls. The water may lead to cracks in bricks and lead the the building collapse. If the weather conditions did not change, it may just mean that the walls stay damp without getting the opportunity to dry out. The objectives of this proposed topic are to test compressive strength of the blocks, to study the porosity of interlocking block and most importantly, to test the water resistance of the interlocking block wall with three different conditions that is normal block wall, block wall with mortar as infill and block wall added with grout around the block. The method for porosity test,is by using vacuum saturation method. The test for block wall is by pouring the interlocking block wall with water. The porosity for normal block is with 16.03 % while for the block with mortar as infill, 10.98 %. The block wall with assemble grout around the block is the best water resistance among the three interlocking block wall. This grouted wall take 39 minutes for the water to pass through all the blocks. The poorest water resistance is normal block wall that take only 17 minutes for the water to pass through the wall. This research can conclude that the type of assemble on the interlocking block wall affected the time for the water to went through the wall.
format Undergraduates Project Papers
author Mohamad Aizuddin, Kamar
author_facet Mohamad Aizuddin, Kamar
author_sort Mohamad Aizuddin, Kamar
title The water resistance of interlocking block wall
title_short The water resistance of interlocking block wall
title_full The water resistance of interlocking block wall
title_fullStr The water resistance of interlocking block wall
title_full_unstemmed The water resistance of interlocking block wall
title_sort water resistance of interlocking block wall
publishDate 2015
url http://umpir.ump.edu.my/id/eprint/11911/
http://umpir.ump.edu.my/id/eprint/11911/
http://umpir.ump.edu.my/id/eprint/11911/1/FKKSA%20-%20MOHAMAD%20AIZUDDIN%20BIN%20KAMAR%20%28CD9302%29.pdf
http://umpir.ump.edu.my/id/eprint/11911/2/FKKSA%20-%20MOHAMAD%20AIZUDDIN%20BIN%20KAMAR%20%28CD9302%29%20-%20CHAP%203.pdf
http://umpir.ump.edu.my/id/eprint/11911/3/FKKSA%20-%20MOHAMAD%20AIZUDDIN%20BIN%20KAMAR%20%28CD9302%29%20-%20CHAP%201.pdf
first_indexed 2023-09-18T22:12:58Z
last_indexed 2023-09-18T22:12:58Z
_version_ 1777415150723137536