Settlement of an embankment treated with preloading and prefabricated vertical drain of east-coast highway phase 2 (a case study)
Soft soils are not suitable for construction of buildings or facilities without having soil improvements. The soil improvements that are used in the chosen site are Preloading and Prefabricated Vertical Drain (PVD). Analysis of settlement is important to evaluate the site before the construction beg...
Main Author: | Nur Anis Adlina, Mat Noor |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/13805/ http://umpir.ump.edu.my/id/eprint/13805/ http://umpir.ump.edu.my/id/eprint/13805/1/FKASA%20-%20NUR%20ANIS%20ADLINA%20MAT%20NOOR.pdf |
Similar Items
-
Settlement of embankment treated with preloading and prefabricated vertical drain (a case study)
by: Noormariani, Ismail
Published: (2012) -
Evaluation and Utilization of Kuantan Clayey Soil as Material Embankment for Roadway
by: Achmad Fauzi, Abdul Wahab, et al.
Published: (2014) -
Bending Behavior of Semi-Continuous Prefabricated Profiled Steel Sheeting (PSSDB) Floor Panels
by: Norhaiza, Nordin, et al.
Published: (2011) -
A study on the characteristic and performance of cascade drain in Malaysia
by: Siti Nur Affizza , Md Yusuf
Published: (2013) -
Correlation between crash temporal-spatial pattern and crash injury types at east coast expressway phase 2
by: Nor Azira, Rasedi
Published: (2017)