The problem of resource planning in construction project in Kuantan

This research was conducted to identify the problem of resource planning in construction project. Besides that, the objective for this research was to rank the most frequent problem that occur during resource planning in construction project. This objective to ensure that the project manager, engine...

Full description

Bibliographic Details
Main Author: Siti Nor, Azahari
Format: Undergraduates Project Papers
Language:English
English
English
Published: 2016
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/16026/
http://umpir.ump.edu.my/id/eprint/16026/
http://umpir.ump.edu.my/id/eprint/16026/1/The%20problem%20of%20resource%20planning%20in%20construction%20project%20in%20Kuantan-Table%20of%20content-FIM-Siti%20Nor%20Azahari-CD%2010362.pdf
http://umpir.ump.edu.my/id/eprint/16026/7/The%20problem%20of%20resource%20planning%20in%20construction%20project%20in%20Kuantan-Abstract-FIM-Siti%20Nor%20Azahari-CD%2010362.pdf
http://umpir.ump.edu.my/id/eprint/16026/8/The%20problem%20of%20resource%20planning%20in%20construction%20project%20in%20Kuantan-Chapter%201-FIM-Siti%20Nor%20Azahari-CD%2010362.pdf
id ump-16026
recordtype eprints
spelling ump-160262017-01-16T05:43:14Z http://umpir.ump.edu.my/id/eprint/16026/ The problem of resource planning in construction project in Kuantan Siti Nor, Azahari HD Industries. Land use. Labor HD28 Management. Industrial Management This research was conducted to identify the problem of resource planning in construction project. Besides that, the objective for this research was to rank the most frequent problem that occur during resource planning in construction project. This objective to ensure that the project manager, engineer and others to be prepared and find the alternative to reduce this problem. In this research, the method that used for obtaining survey research was questionnaire for collecting the response from the project manager, engineer and others. The total respondents for this research were 32 from building construction company that categorized in G6 and located in Kuantan, Pahang. Next, Statistical Package for the Social Science (SPSS) was used in analysing these research finding. The result for this research showed that the problem of material planning in construction project was the highest value of the mean. Lastly, the main suggested recommendation for this research is to increase the number of respondent and number of questionnaire in order to obtain more accurate data. 2016-01 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/16026/1/The%20problem%20of%20resource%20planning%20in%20construction%20project%20in%20Kuantan-Table%20of%20content-FIM-Siti%20Nor%20Azahari-CD%2010362.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/16026/7/The%20problem%20of%20resource%20planning%20in%20construction%20project%20in%20Kuantan-Abstract-FIM-Siti%20Nor%20Azahari-CD%2010362.pdf application/pdf en http://umpir.ump.edu.my/id/eprint/16026/8/The%20problem%20of%20resource%20planning%20in%20construction%20project%20in%20Kuantan-Chapter%201-FIM-Siti%20Nor%20Azahari-CD%2010362.pdf Siti Nor, Azahari (2016) The problem of resource planning in construction project in Kuantan. Faculty of Industrial Management, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:98306&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
English
English
topic HD Industries. Land use. Labor
HD28 Management. Industrial Management
spellingShingle HD Industries. Land use. Labor
HD28 Management. Industrial Management
Siti Nor, Azahari
The problem of resource planning in construction project in Kuantan
description This research was conducted to identify the problem of resource planning in construction project. Besides that, the objective for this research was to rank the most frequent problem that occur during resource planning in construction project. This objective to ensure that the project manager, engineer and others to be prepared and find the alternative to reduce this problem. In this research, the method that used for obtaining survey research was questionnaire for collecting the response from the project manager, engineer and others. The total respondents for this research were 32 from building construction company that categorized in G6 and located in Kuantan, Pahang. Next, Statistical Package for the Social Science (SPSS) was used in analysing these research finding. The result for this research showed that the problem of material planning in construction project was the highest value of the mean. Lastly, the main suggested recommendation for this research is to increase the number of respondent and number of questionnaire in order to obtain more accurate data.
format Undergraduates Project Papers
author Siti Nor, Azahari
author_facet Siti Nor, Azahari
author_sort Siti Nor, Azahari
title The problem of resource planning in construction project in Kuantan
title_short The problem of resource planning in construction project in Kuantan
title_full The problem of resource planning in construction project in Kuantan
title_fullStr The problem of resource planning in construction project in Kuantan
title_full_unstemmed The problem of resource planning in construction project in Kuantan
title_sort problem of resource planning in construction project in kuantan
publishDate 2016
url http://umpir.ump.edu.my/id/eprint/16026/
http://umpir.ump.edu.my/id/eprint/16026/
http://umpir.ump.edu.my/id/eprint/16026/1/The%20problem%20of%20resource%20planning%20in%20construction%20project%20in%20Kuantan-Table%20of%20content-FIM-Siti%20Nor%20Azahari-CD%2010362.pdf
http://umpir.ump.edu.my/id/eprint/16026/7/The%20problem%20of%20resource%20planning%20in%20construction%20project%20in%20Kuantan-Abstract-FIM-Siti%20Nor%20Azahari-CD%2010362.pdf
http://umpir.ump.edu.my/id/eprint/16026/8/The%20problem%20of%20resource%20planning%20in%20construction%20project%20in%20Kuantan-Chapter%201-FIM-Siti%20Nor%20Azahari-CD%2010362.pdf
first_indexed 2023-09-18T22:21:20Z
last_indexed 2023-09-18T22:21:20Z
_version_ 1777415677119823872