Case on Integrated Time and Cost Monitoring of Construction Projects

The traditional approach of project time and cost performance measurement is generally based on direct monitoring in which there is a split-up between them. It does not truly relate the time versus cost performance of the project. Furthermore, this approach is not so much efficient to provide early...

Full description

Bibliographic Details
Main Authors: M., Waris, Panda, Sitansu
Other Authors: Sorooshian, Shahryar
Format: Book Section
Language:English
Published: Penerbit UMP 2017
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/19068/
http://umpir.ump.edu.my/id/eprint/19068/1/fim-2017-waris-Case%20on%20Integrated%20Time%20and%20Cost%20Monitoring%20of%20Construction%20Projects.pdf
id ump-19068
recordtype eprints
spelling ump-190682017-11-15T01:19:07Z http://umpir.ump.edu.my/id/eprint/19068/ Case on Integrated Time and Cost Monitoring of Construction Projects M., Waris Panda, Sitansu HD28 Management. Industrial Management The traditional approach of project time and cost performance measurement is generally based on direct monitoring in which there is a split-up between them. It does not truly relate the time versus cost performance of the project. Furthermore, this approach is not so much efficient to provide early warning indicators and forecast future performance trends. As a remedy of these limitations in traditional monitoring practices, this case has proposed Earned Value Analysis (EVA) which integrates the work scope, cost and time to enable effective project performance measurement. Penerbit UMP Sorooshian, Shahryar 2017 Book Section PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/19068/1/fim-2017-waris-Case%20on%20Integrated%20Time%20and%20Cost%20Monitoring%20of%20Construction%20Projects.pdf M., Waris and Panda, Sitansu (2017) Case on Integrated Time and Cost Monitoring of Construction Projects. In: Collection of Teaching Cases for Business Administration Studies. Penerbit UMP, Kuantan, Pahang, pp. 22-25. ISBN 978-967-2054-50-4
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
M., Waris
Panda, Sitansu
Case on Integrated Time and Cost Monitoring of Construction Projects
description The traditional approach of project time and cost performance measurement is generally based on direct monitoring in which there is a split-up between them. It does not truly relate the time versus cost performance of the project. Furthermore, this approach is not so much efficient to provide early warning indicators and forecast future performance trends. As a remedy of these limitations in traditional monitoring practices, this case has proposed Earned Value Analysis (EVA) which integrates the work scope, cost and time to enable effective project performance measurement.
author2 Sorooshian, Shahryar
author_facet Sorooshian, Shahryar
M., Waris
Panda, Sitansu
format Book Section
author M., Waris
Panda, Sitansu
author_sort M., Waris
title Case on Integrated Time and Cost Monitoring of Construction Projects
title_short Case on Integrated Time and Cost Monitoring of Construction Projects
title_full Case on Integrated Time and Cost Monitoring of Construction Projects
title_fullStr Case on Integrated Time and Cost Monitoring of Construction Projects
title_full_unstemmed Case on Integrated Time and Cost Monitoring of Construction Projects
title_sort case on integrated time and cost monitoring of construction projects
publisher Penerbit UMP
publishDate 2017
url http://umpir.ump.edu.my/id/eprint/19068/
http://umpir.ump.edu.my/id/eprint/19068/1/fim-2017-waris-Case%20on%20Integrated%20Time%20and%20Cost%20Monitoring%20of%20Construction%20Projects.pdf
first_indexed 2023-09-18T22:27:17Z
last_indexed 2023-09-18T22:27:17Z
_version_ 1777416051524370432