The study on cause and effect of abandoned housing project in selangor

Construction industry is one of the most dynamic, risky, and challenging industries not only in Malaysia but other countries too. The main issues facing by the construction industry is abandoned building project. The issue of abandoned building had happened across the globe and brings negative impac...

Full description

Bibliographic Details
Main Authors: Nur Farhayu, Ariffin, Mohd Faizal, Md Jaafar, Mohamad Idris, Ali, Noram Irwan, Ramli, Khairunisa, Muthusamy, Saffuan, Wan Ahmad, N. H., Abd Khalid
Format: Conference or Workshop Item
Language:English
English
Published: IOP Publishing Ltd 2018
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/22223/
http://umpir.ump.edu.my/id/eprint/22223/
http://umpir.ump.edu.my/id/eprint/22223/1/63.%20The%20Study%20on%20Cause%20and%20Effect%20of%20Abandoned%20Housing%20Project%20in%20Selangor.pdf
http://umpir.ump.edu.my/id/eprint/22223/2/63.1%20The%20Study%20on%20Cause%20and%20Effect%20of%20Abandoned%20Housing%20Project%20in%20Selangor.pdf
id ump-22223
recordtype eprints
spelling ump-222232018-12-10T03:09:22Z http://umpir.ump.edu.my/id/eprint/22223/ The study on cause and effect of abandoned housing project in selangor Nur Farhayu, Ariffin Mohd Faizal, Md Jaafar Mohamad Idris, Ali Noram Irwan, Ramli Khairunisa, Muthusamy Saffuan, Wan Ahmad N. H., Abd Khalid TA Engineering (General). Civil engineering (General) Construction industry is one of the most dynamic, risky, and challenging industries not only in Malaysia but other countries too. The main issues facing by the construction industry is abandoned building project. The issue of abandoned building had happened across the globe and brings negative impact to the nation and country. In Malaysia, the magnitude of this issue has grown to an unbearable state. According to the Sales and Purchase agreement, abandoned building is a construction work in a project site that has been continuously stalled for 6 months or more, whether during the project completion period or beyond the scheduled date of completion. When the projects of the building become abandoned, it gives an adverse effect such as downfall of economic growth. Besides, it will cause a serious problem of sustainability especially a waste of natural resources/material used for the construction. In order to prevent this problem, some mitigation plan is needed. This study was conducted to study the cause, effect and economic analysis on abandoned project. There is a need for broader discussions on its implications to the society and nation. The questionnaire survey was conducted and distributed to most civil engineers around Malaysia. The results was analysed using average index methods and likert scale. The result shows that there are many factors that contribute to the abandoned building project which mostly comes from the developer management itself. The loss of money when the project is abandoned is unneglectable. A mitigation plan need to be done in order to revive the abandoned project therefore, it will help in growth of economy in Malaysia. IOP Publishing Ltd 2018-05 Conference or Workshop Item PeerReviewed pdf en cc_by http://umpir.ump.edu.my/id/eprint/22223/1/63.%20The%20Study%20on%20Cause%20and%20Effect%20of%20Abandoned%20Housing%20Project%20in%20Selangor.pdf pdf en http://umpir.ump.edu.my/id/eprint/22223/2/63.1%20The%20Study%20on%20Cause%20and%20Effect%20of%20Abandoned%20Housing%20Project%20in%20Selangor.pdf Nur Farhayu, Ariffin and Mohd Faizal, Md Jaafar and Mohamad Idris, Ali and Noram Irwan, Ramli and Khairunisa, Muthusamy and Saffuan, Wan Ahmad and N. H., Abd Khalid (2018) The study on cause and effect of abandoned housing project in selangor. In: IOP Conference Series: Materials Science and Engineering: 14th International Conference On Concrete Engineering And Technology 2018 (CONCET 2018), 7 - 10 Aug 2018 , Kuala Lumpur. pp. 1-7., 431 (8). ISSN 17578981 (Unpublished) http://iopscience.iop.org/article/10.1088/1757-899X/431/8/082013/pdf
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Nur Farhayu, Ariffin
Mohd Faizal, Md Jaafar
Mohamad Idris, Ali
Noram Irwan, Ramli
Khairunisa, Muthusamy
Saffuan, Wan Ahmad
N. H., Abd Khalid
The study on cause and effect of abandoned housing project in selangor
description Construction industry is one of the most dynamic, risky, and challenging industries not only in Malaysia but other countries too. The main issues facing by the construction industry is abandoned building project. The issue of abandoned building had happened across the globe and brings negative impact to the nation and country. In Malaysia, the magnitude of this issue has grown to an unbearable state. According to the Sales and Purchase agreement, abandoned building is a construction work in a project site that has been continuously stalled for 6 months or more, whether during the project completion period or beyond the scheduled date of completion. When the projects of the building become abandoned, it gives an adverse effect such as downfall of economic growth. Besides, it will cause a serious problem of sustainability especially a waste of natural resources/material used for the construction. In order to prevent this problem, some mitigation plan is needed. This study was conducted to study the cause, effect and economic analysis on abandoned project. There is a need for broader discussions on its implications to the society and nation. The questionnaire survey was conducted and distributed to most civil engineers around Malaysia. The results was analysed using average index methods and likert scale. The result shows that there are many factors that contribute to the abandoned building project which mostly comes from the developer management itself. The loss of money when the project is abandoned is unneglectable. A mitigation plan need to be done in order to revive the abandoned project therefore, it will help in growth of economy in Malaysia.
format Conference or Workshop Item
author Nur Farhayu, Ariffin
Mohd Faizal, Md Jaafar
Mohamad Idris, Ali
Noram Irwan, Ramli
Khairunisa, Muthusamy
Saffuan, Wan Ahmad
N. H., Abd Khalid
author_facet Nur Farhayu, Ariffin
Mohd Faizal, Md Jaafar
Mohamad Idris, Ali
Noram Irwan, Ramli
Khairunisa, Muthusamy
Saffuan, Wan Ahmad
N. H., Abd Khalid
author_sort Nur Farhayu, Ariffin
title The study on cause and effect of abandoned housing project in selangor
title_short The study on cause and effect of abandoned housing project in selangor
title_full The study on cause and effect of abandoned housing project in selangor
title_fullStr The study on cause and effect of abandoned housing project in selangor
title_full_unstemmed The study on cause and effect of abandoned housing project in selangor
title_sort study on cause and effect of abandoned housing project in selangor
publisher IOP Publishing Ltd
publishDate 2018
url http://umpir.ump.edu.my/id/eprint/22223/
http://umpir.ump.edu.my/id/eprint/22223/
http://umpir.ump.edu.my/id/eprint/22223/1/63.%20The%20Study%20on%20Cause%20and%20Effect%20of%20Abandoned%20Housing%20Project%20in%20Selangor.pdf
http://umpir.ump.edu.my/id/eprint/22223/2/63.1%20The%20Study%20on%20Cause%20and%20Effect%20of%20Abandoned%20Housing%20Project%20in%20Selangor.pdf
first_indexed 2023-09-18T22:32:58Z
last_indexed 2023-09-18T22:32:58Z
_version_ 1777416408286625792