The selection of wind power project location in the Southeastern Corridor of Pakistan: A factor analysis, AHP, and fuzzy-TOPSIS application
Pakistan has sufficient wind energy potential across various locations of the country. However, so far, wind energy development has not attained sufficient momentum matching its potential. Amongst various other challenges, the site selection for wind power development has always been a primary conce...
Main Authors: | Solangi, Yasir Ahmed, Tan, Qingmei, M., Waris, Mirjat, Nayyar Hussain, Ahmed, Ifzal |
---|---|
Format: | Article |
Language: | English English |
Published: |
MDPI AG
2018
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/22698/ http://umpir.ump.edu.my/id/eprint/22698/ http://umpir.ump.edu.my/id/eprint/22698/ http://umpir.ump.edu.my/id/eprint/22698/1/The%20selection%20of%20wind%20power%20project%20location%20in%20the%20Southeastern%20Corridor%20of%20Pakistan.pdf http://umpir.ump.edu.my/id/eprint/22698/7/The%20Selection%20of%20Wind%20Power%20Project%20Location.pdf |
Similar Items
-
An integrated Delphi-AHP and Fuzzy TOPSIS approach toward ranking and selection of renewable energy resources in Pakistan
by: Solangi, Yasir Ahmed, et al.
Published: (2019) -
A Review of Energy and Power Planning and Policies of Pakistan
by: Mirjat, Nayyar Hussain, et al.
Published: (2017) -
Conceptual framework for project governance of public sector infrastructure project in Pakistan
by: Khan, Asadullah, et al.
Published: (2019) -
Multi-criteria analysis of electricity generation scenarios for sustainable energy planning in Pakistan
by: Mirjat, Nayyar Hussain, et al.
Published: (2018) -
MCDM-AHP Method in Decision Makings
by: Nor Fillianie, Aziz, et al.
Published: (2016)