spelling ump-236712019-02-25T01:20:13Z http://umpir.ump.edu.my/id/eprint/23671/ Study on causes of delay for government construction project in Kuching, Sarawak Nurul Asyilah, Romzi HD28 Management. Industrial Management TA Engineering (General). Civil engineering (General) Delay is a worldwide problem which normally occurs in every project. Delay of the project occurs when a period of time of the completion date is late or postponed. Since the project delayed, the cost of the project will have escalation which will risk the contractors. Instead of getting a benefit from the project, they gain losses. The aim of this study is to identify causes of delay for government construction project in Kuching, Sarawak. This study presents 24 lists of construction delays from research on previous studies. A questionnaire survey was prepared and distributed to 200 companies represented by the client, consultant, and contractor in Kuching, Sarawak. Cronbach’s Alpha and One-Way ANOVA from Statistical Package of Social Science, SPSS are used for reliability test and analysis of data collected from the questionnaire. In order to understand and get a better recommendation for the delays of projects, interviews were conducted with senior professional and expertise parties which experience more than ten years. This study identified most 5 important causes of delay for government construction project which are (1) slow decision making, (2) poor site management and supervision, (3) shortage of labors, (4) changes of scope of work during construction and (5) late in revising and approving design documents. These findings are expected to be a significant contribution to improve the performance of government construction industry in Kuching, Sarawak. 2017-12 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/23671/1/Study%20on%20causes%20of%20delay%20for%20government%20construction%20project%20in%20Kuching%2C%20Sarawak%20-%20Table%20of%20contents.pdf pdf en http://umpir.ump.edu.my/id/eprint/23671/2/Study%20on%20causes%20of%20delay%20for%20government%20construction%20project%20in%20Kuching%2C%20Sarawak%20-%20Abstract.pdf pdf en http://umpir.ump.edu.my/id/eprint/23671/3/Study%20on%20causes%20of%20delay%20for%20government%20construction%20project%20in%20Kuching%2C%20Sarawak%20-%20Chapter%201.pdf pdf en http://umpir.ump.edu.my/id/eprint/23671/4/Study%20on%20causes%20of%20delay%20for%20government%20construction%20project%20in%20Kuching%2C%20Sarawak%20-%20References.pdf Nurul Asyilah, Romzi (2017) Study on causes of delay for government construction project in Kuching, Sarawak. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang. http://iportal.ump.edu.my/lib/item?id=chamo:103604&theme=UMP2
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
English
English
English
topic HD28 Management. Industrial Management
TA Engineering (General). Civil engineering (General)
spellingShingle HD28 Management. Industrial Management
TA Engineering (General). Civil engineering (General)
Nurul Asyilah, Romzi
Study on causes of delay for government construction project in Kuching, Sarawak
description Delay is a worldwide problem which normally occurs in every project. Delay of the project occurs when a period of time of the completion date is late or postponed. Since the project delayed, the cost of the project will have escalation which will risk the contractors. Instead of getting a benefit from the project, they gain losses. The aim of this study is to identify causes of delay for government construction project in Kuching, Sarawak. This study presents 24 lists of construction delays from research on previous studies. A questionnaire survey was prepared and distributed to 200 companies represented by the client, consultant, and contractor in Kuching, Sarawak. Cronbach’s Alpha and One-Way ANOVA from Statistical Package of Social Science, SPSS are used for reliability test and analysis of data collected from the questionnaire. In order to understand and get a better recommendation for the delays of projects, interviews were conducted with senior professional and expertise parties which experience more than ten years. This study identified most 5 important causes of delay for government construction project which are (1) slow decision making, (2) poor site management and supervision, (3) shortage of labors, (4) changes of scope of work during construction and (5) late in revising and approving design documents. These findings are expected to be a significant contribution to improve the performance of government construction industry in Kuching, Sarawak.
format Undergraduates Project Papers
author Nurul Asyilah, Romzi
author_facet Nurul Asyilah, Romzi
author_sort Nurul Asyilah, Romzi
title Study on causes of delay for government construction project in Kuching, Sarawak
title_short Study on causes of delay for government construction project in Kuching, Sarawak
title_full Study on causes of delay for government construction project in Kuching, Sarawak
title_fullStr Study on causes of delay for government construction project in Kuching, Sarawak
title_full_unstemmed Study on causes of delay for government construction project in Kuching, Sarawak
title_sort study on causes of delay for government construction project in kuching, sarawak
publishDate 2017
url http://umpir.ump.edu.my/id/eprint/23671/
http://umpir.ump.edu.my/id/eprint/23671/
http://umpir.ump.edu.my/id/eprint/23671/1/Study%20on%20causes%20of%20delay%20for%20government%20construction%20project%20in%20Kuching%2C%20Sarawak%20-%20Table%20of%20contents.pdf
http://umpir.ump.edu.my/id/eprint/23671/2/Study%20on%20causes%20of%20delay%20for%20government%20construction%20project%20in%20Kuching%2C%20Sarawak%20-%20Abstract.pdf
http://umpir.ump.edu.my/id/eprint/23671/3/Study%20on%20causes%20of%20delay%20for%20government%20construction%20project%20in%20Kuching%2C%20Sarawak%20-%20Chapter%201.pdf
http://umpir.ump.edu.my/id/eprint/23671/4/Study%20on%20causes%20of%20delay%20for%20government%20construction%20project%20in%20Kuching%2C%20Sarawak%20-%20References.pdf
first_indexed 2023-09-18T22:35:34Z
last_indexed 2023-09-18T22:35:34Z
_version_ 1777416572034351104