4P delays in project management
Purpose - As a result of the increasing challenges of time overrun, several companies regularly set up delay assessment procedures for performance improvement and profit maximization. In the construction industry, projects are enormously complicated and involve significant budgets, and therefore opt...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Emerald
2018
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/23936/ http://umpir.ump.edu.my/id/eprint/23936/ http://umpir.ump.edu.my/id/eprint/23936/ http://umpir.ump.edu.my/id/eprint/23936/1/4P%20delays%20in%20project%20management.pdf |
id |
ump-23936 |
---|---|
recordtype |
eprints |
spelling |
ump-239362020-02-21T07:48:23Z http://umpir.ump.edu.my/id/eprint/23936/ 4P delays in project management Ansah, Richard Hannis Sorooshian, Shahryar AM Museums (General). Collectors and collecting (General) Purpose - As a result of the increasing challenges of time overrun, several companies regularly set up delay assessment procedures for performance improvement and profit maximization. In the construction industry, projects are enormously complicated and involve significant budgets, and therefore optimizing project performance through the root cause analysis should be imperative for every project manager. Typically issues of delays in projects are generally discussed and problematized separately, yet a comprehensive framework for systematic analysis and grouping of delays is rarely contended. The purpose of this paper is to introduce the 4P concept (project related, practices, participants, and procurement) for identifying, analyzing, and classifying delays in the internal environment of the project development process. Design/methodology/approach - The 4P conceptual framework was validated through the synthesis of the existing literature. Findings - Interestingly, despite the increasing concerns about delays in the construction industry, most research on delays are project and/or country specific, thus no consensus about the sources of delays. The application of the proposed concept as a theoretical framework would provide an understanding of the available delay sources, their risks and use for project delay assessment and classification. Research limitations/implications - This study grouped delays based on the shared characteristics and four main sources were identified and analyzed. There may be other sources or factors, yet would be dependent or aspect of the 4P. Practical implications - The study informs project teams to reduce delays in the construction industry. Originality/value - The paper is an application of risk assessment tool to conceptualize delays in the internal project environment. Emerald 2018 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/23936/1/4P%20delays%20in%20project%20management.pdf Ansah, Richard Hannis and Sorooshian, Shahryar (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25 (1). pp. 62-76. ISSN 0969-9988 (Print); 1365-232X (Online) https://doi.org/10.1108/ECAM-09-2016-0199 https://doi.org/10.1108/ECAM-09-2016-0199 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English |
topic |
AM Museums (General). Collectors and collecting (General) |
spellingShingle |
AM Museums (General). Collectors and collecting (General) Ansah, Richard Hannis Sorooshian, Shahryar 4P delays in project management |
description |
Purpose - As a result of the increasing challenges of time overrun, several companies regularly set up delay assessment procedures for performance improvement and profit maximization. In the construction industry, projects are enormously complicated and involve significant budgets, and therefore optimizing project performance through the root cause analysis should be imperative for every project manager. Typically issues of delays in projects are generally discussed and problematized separately, yet a comprehensive framework for systematic analysis and grouping of delays is rarely contended. The purpose of this paper is to introduce the 4P concept (project related, practices, participants, and procurement) for identifying, analyzing, and classifying delays in the internal environment of the project development process. Design/methodology/approach - The 4P conceptual framework was validated through the synthesis of the existing literature. Findings - Interestingly, despite the increasing concerns about delays in the construction industry, most research on delays are project and/or country specific, thus no consensus about the sources of delays. The application of the proposed concept as a theoretical framework would provide an understanding of the available delay sources, their risks and use for project delay assessment and classification. Research limitations/implications - This study grouped delays based on the shared characteristics and four main sources were identified and analyzed. There may be other sources or factors, yet would be dependent or aspect of the 4P. Practical implications - The study informs project teams to reduce delays in the construction industry. Originality/value - The paper is an application of risk assessment tool to conceptualize delays in the internal project environment. |
format |
Article |
author |
Ansah, Richard Hannis Sorooshian, Shahryar |
author_facet |
Ansah, Richard Hannis Sorooshian, Shahryar |
author_sort |
Ansah, Richard Hannis |
title |
4P delays in project management |
title_short |
4P delays in project management |
title_full |
4P delays in project management |
title_fullStr |
4P delays in project management |
title_full_unstemmed |
4P delays in project management |
title_sort |
4p delays in project management |
publisher |
Emerald |
publishDate |
2018 |
url |
http://umpir.ump.edu.my/id/eprint/23936/ http://umpir.ump.edu.my/id/eprint/23936/ http://umpir.ump.edu.my/id/eprint/23936/ http://umpir.ump.edu.my/id/eprint/23936/1/4P%20delays%20in%20project%20management.pdf |
first_indexed |
2023-09-18T22:36:04Z |
last_indexed |
2023-09-18T22:36:04Z |
_version_ |
1777416603489533952 |