Mohammad Solhi, M. (2010). The analysis of factors contributed to delay and method to analyze the delay in construction project.
Chicago Style (17th ed.) CitationMohammad Solhi, Mohammed. The Analysis of Factors Contributed to Delay and Method to Analyze the Delay in Construction Project. 2010.
MLA (8th ed.) CitationMohammad Solhi, Mohammed. The Analysis of Factors Contributed to Delay and Method to Analyze the Delay in Construction Project. 2010.
Warning: These citations may not always be 100% accurate.