APA (7th ed.) Citation

Muhamad Amirul, A. J., Nor Rul Hasma, A., Ibrahim Haruna, S., Mahfuzah, M., Rosdiyana, S., & Pebrianti, D. (2019). Optimal placement of TCSC for reactive power planning using grasshopper optimization algorithm considering line outage (N-M). Springer Verlag.

Chicago Style (17th ed.) Citation

Muhamad Amirul, Asyraf Juhari, Abdullah Nor Rul Hasma, Shanono Ibrahim Haruna, Mustafa Mahfuzah, Samad Rosdiyana, and Dwi Pebrianti. Optimal Placement of TCSC for Reactive Power Planning Using Grasshopper Optimization Algorithm Considering Line Outage (N-M). Springer Verlag, 2019.

MLA (8th ed.) Citation

Muhamad Amirul, Asyraf Juhari, et al. Optimal Placement of TCSC for Reactive Power Planning Using Grasshopper Optimization Algorithm Considering Line Outage (N-M). Springer Verlag, 2019.

Warning: These citations may not always be 100% accurate.