Selection of method in construction industry by using AHP method
Method in construction industry is very important in construction industry. The type of method used in construction may affect the quality of the project. The method that discuss in this research are traditional method, design and build and industrial building system. According to (Sutt. J., 2011),...
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/26255/ http://umpir.ump.edu.my/id/eprint/26255/ http://umpir.ump.edu.my/id/eprint/26255/1/Selection%20of%20method%20in%20construction%20industry%20by%20using%20AHP.pdf |
id |
ump-26255 |
---|---|
recordtype |
eprints |
spelling |
ump-262552019-10-30T05:56:56Z http://umpir.ump.edu.my/id/eprint/26255/ Selection of method in construction industry by using AHP method Nur Syafikah, Nasrudin NA Architecture TA Engineering (General). Civil engineering (General) Method in construction industry is very important in construction industry. The type of method used in construction may affect the quality of the project. The method that discuss in this research are traditional method, design and build and industrial building system. According to (Sutt. J., 2011), in the traditional procurement method, the client will enter into the contracts separately with architect and contractor. The architect will responsible for design work, while contractor will responsible for construction work. Hence, design and build is contractor accepts responsibility for some or all of the design and for industrial building system is construction system that is built using pre-fabricated components. The objectives of this study are to identify the criteria and suitability for selecting delivery method in construction by Analytical Hierarchy Process (AHP) method. Analytical Hierarchy Process (AHP) is to determine the weights of importance of the parameters. The data concluded, the contractor for Grade 7 is suitable to use industrial building system method and traditional method is suitable for the contractor Grade 1. 2018-06 Undergraduates Project Papers NonPeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/26255/1/Selection%20of%20method%20in%20construction%20industry%20by%20using%20AHP.pdf Nur Syafikah, Nasrudin (2018) Selection of method in construction industry by using AHP method. Faculty of Civil Engineering and Earth Resources, Universiti Malaysia Pahang. https://efind.ump.edu.my/cgi-bin/koha/opac-detail.pl?biblionumber=7981 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English |
topic |
NA Architecture TA Engineering (General). Civil engineering (General) |
spellingShingle |
NA Architecture TA Engineering (General). Civil engineering (General) Nur Syafikah, Nasrudin Selection of method in construction industry by using AHP method |
description |
Method in construction industry is very important in construction industry. The type of method used in construction may affect the quality of the project. The method that discuss in this research are traditional method, design and build and industrial building system. According to (Sutt. J., 2011), in the traditional procurement method, the client will enter into the contracts separately with architect and contractor. The architect will responsible for design work, while contractor will responsible for construction work. Hence, design and build is contractor accepts responsibility for some or all of the design and for industrial building system is construction system that is built using pre-fabricated components. The objectives of this study are to identify the criteria and suitability for selecting delivery method in construction by Analytical Hierarchy Process (AHP) method. Analytical Hierarchy Process (AHP) is to determine the weights of importance of the parameters. The data concluded, the contractor for Grade 7 is suitable to use industrial building system method and traditional method is suitable for the contractor Grade 1. |
format |
Undergraduates Project Papers |
author |
Nur Syafikah, Nasrudin |
author_facet |
Nur Syafikah, Nasrudin |
author_sort |
Nur Syafikah, Nasrudin |
title |
Selection of method in construction industry by using AHP method |
title_short |
Selection of method in construction industry by using AHP method |
title_full |
Selection of method in construction industry by using AHP method |
title_fullStr |
Selection of method in construction industry by using AHP method |
title_full_unstemmed |
Selection of method in construction industry by using AHP method |
title_sort |
selection of method in construction industry by using ahp method |
publishDate |
2018 |
url |
http://umpir.ump.edu.my/id/eprint/26255/ http://umpir.ump.edu.my/id/eprint/26255/ http://umpir.ump.edu.my/id/eprint/26255/1/Selection%20of%20method%20in%20construction%20industry%20by%20using%20AHP.pdf |
first_indexed |
2023-09-18T22:40:46Z |
last_indexed |
2023-09-18T22:40:46Z |
_version_ |
1777416899845423104 |