Success Factors of Design-Build Public Sector Projects in Malaysia
Various procurement methods are employed in the construction industry, with each having varying success rates. The popularity of design and build (D-B) method has been increasing worldwide because its distinctive features of integrating design and construction have successfully addressed the problem...
Main Authors: | Z. P., Lee, R. A., Rahman, S. I., Doh |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/26519/ http://umpir.ump.edu.my/id/eprint/26519/1/Success%20factors%20of%20design-build%20public%20sector%20projects%20in%20Malaysia.pdf |
Similar Items
-
Factors effecting the cost management in construction projects
by: M. A., Faten Albtoush, et al.
Published: (2019) -
Effects Of Contractors’ Delay Factors On Building Project Performance Among Kuantan Malaysian Construction Industry
by: N.S.A, Samsudin, et al.
Published: (2020) -
Investigating the relationship between site supervision and IBS based construction projects
by: Saad, M. Syamsyul H., et al.
Published: (2019) -
Special based isolation system for low-rise RC building
by: Hamid, N. H., et al.
Published: (2019) -
Incorporation of risk index for risk response and risk mitigation strategies of public-private partnership (PPP) housing construction project in Malaysia
by: P. Z., Razi, et al.
Published: (2019)