Improving productivity using value stream mapping (VSM) - a case study
The presence of non-value added (NVA) activities in a production line will affect the productivity performance. This will lead to a high production cost due to non-value added activities are not in the customer specification. As a result more resources are required to fulfil the NVA activities. Iden...
Main Authors: | Ahmad Nasser, Mohd Rose, N. M. Z., Nik Mohamed, M. F. F., Ab Rashid, Hafizzudin, Mohd Noor, Alias, Mohd |
---|---|
Format: | Conference or Workshop Item |
Language: | English English |
Published: |
2019
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/26930/ http://umpir.ump.edu.my/id/eprint/26930/1/91.%20Improving%20productivity%20using%20value%20stream%20mapping%20%28VSM%29.pdf http://umpir.ump.edu.my/id/eprint/26930/2/91.1%20Improving%20productivity%20using%20value%20stream%20mapping%20%28VSM%29.pdf |
Similar Items
-
Value stream mapping (VSM) of production line for a high volume manufacturing industry
by: A.N., Mustafizul Karim, et al.
Published: (2012) -
Lead time reduction in SME by using value stream mapping (VSM) technique
by: Farah Liyana, Hassan
Published: (2013) -
Applying value stream mapping for productivity improvement
of a metal stamping industry
by: Karim, A.N. Mustafizul, et al.
Published: (2012) -
Productivity improvement using VSM at TT Electronis Sdn Bhd
by: Muhammad Najmi, Ahmat
Published: (2016) -
Value stream mapping how to visualize work and align leadership for organizational transformation
by: Martin
Published: (2014)