Selection of Method in Construction Industry by using Analytical Hierarchy Process (AHP)

Method in construction industry is very important in construction industry. The type of method used in construction may affect the quality of the project. Three distinct method that will be explore in this paper are traditional method, design and build and industrial building system (IBS). The tradi...

Full description

Bibliographic Details
Main Authors: Putri Zulaiha, Razi, Noram Irwan, Ramli, Mohamad Idris, Ali, Putra Jaya, Ramadhansyah
Format: Conference or Workshop Item
Language:English
Published: IOP Publishing 2020
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/27226/
http://umpir.ump.edu.my/id/eprint/27226/
http://umpir.ump.edu.my/id/eprint/27226/1/Selection%20of%20Method%20in%20Construction%20Industry.pdf
Description
Summary:Method in construction industry is very important in construction industry. The type of method used in construction may affect the quality of the project. Three distinct method that will be explore in this paper are traditional method, design and build and industrial building system (IBS). The traditional procurement method, known for its separate entity by the client, architect and contractor. The architect will responsible for design work, while contractor will responsible for construction work. Meanwhile, the design and build, whereby the contractor accepts responsibility for some or all of the design finally the IBS is when the construction built using pre-fabricated components. This paper aiming in identifying the criteria and suitability for selecting different kind of construction delivery method in construction by using the multi-criteria decision making (MCDM) namely the Analytical Hierarchy Process (AHP) method. Results provides some empirical finding which contractor for Grade 7 is suitable employing the industrial building system(IBS) method while the traditional method is appropriately for the Grade 1 contractor.