Survey of project management methods which employed by fixed position layout in Malaysia
This thesis presents the survey on the project management methods which employed in fixed-position layout in Malaysia. The objectives of this research are to investigate the type of project management methodology and tools, the factors considered in project management methods and the performance of...
Main Author: | |
---|---|
Format: | Undergraduates Project Papers |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/3478/ http://umpir.ump.edu.my/id/eprint/3478/ http://umpir.ump.edu.my/id/eprint/3478/1/cd6277_85.pdf |
id |
ump-3478 |
---|---|
recordtype |
eprints |
spelling |
ump-34782015-03-03T08:01:25Z http://umpir.ump.edu.my/id/eprint/3478/ Survey of project management methods which employed by fixed position layout in Malaysia Siti Raihana, Shahadan T Technology (General) This thesis presents the survey on the project management methods which employed in fixed-position layout in Malaysia. The objectives of this research are to investigate the type of project management methodology and tools, the factors considered in project management methods and the performance of project management methods implemented in fixed- position layout (construction) in Malaysia. A questionnaire survey about project management methods were conducted at construction companies. Critical path method (CPM), Program Evaluation & Review Technique (PERT) and graphical evaluation & review technique (GERT) have been chosen as predictors in order to predict which project management method most suitable to be employed in fixed-position layout. The survey shows that the most significant method is CCPM and for tools is PERT followed by CPM and lastly GERT. CPM and PERT analysis were implemented to one of the construction project. As a conclusion, by having a good project management system such as CPM and PERT, the fixed position layout industry can strive for better improvement, redefine its image and steer itself in meeting a success in near future. 2012-06 Undergraduates Project Papers NonPeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/3478/1/cd6277_85.pdf Siti Raihana, Shahadan (2012) Survey of project management methods which employed by fixed position layout in Malaysia. Faculty of Manufacturing Engineering, Universiti Malaysia Pahang. http://iportal.ump.edu.my:8080/lib/item?id=chamo:65312&theme=UMP |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English |
topic |
T Technology (General) |
spellingShingle |
T Technology (General) Siti Raihana, Shahadan Survey of project management methods which employed by fixed position layout in Malaysia |
description |
This thesis presents the survey on the project management methods which employed in fixed-position layout in Malaysia. The objectives of this research are to investigate the type of project management methodology and tools, the factors considered in project management methods and the performance of project management methods implemented in fixed- position layout (construction) in Malaysia. A questionnaire survey about project management methods were conducted at construction companies. Critical path method (CPM), Program Evaluation & Review Technique (PERT) and graphical evaluation & review technique (GERT) have been chosen as predictors in order to predict which project management method most suitable to be employed in fixed-position layout. The survey shows that the most significant method is CCPM and for tools is PERT followed by CPM and lastly GERT. CPM and PERT analysis were implemented to one of the construction project. As a conclusion, by having a good project management system such as CPM and PERT, the fixed position layout industry can strive for better improvement, redefine its image and steer itself in meeting a success in near future. |
format |
Undergraduates Project Papers |
author |
Siti Raihana, Shahadan |
author_facet |
Siti Raihana, Shahadan |
author_sort |
Siti Raihana, Shahadan |
title |
Survey of project management methods which employed by fixed position layout in Malaysia |
title_short |
Survey of project management methods which employed by fixed position layout in Malaysia |
title_full |
Survey of project management methods which employed by fixed position layout in Malaysia |
title_fullStr |
Survey of project management methods which employed by fixed position layout in Malaysia |
title_full_unstemmed |
Survey of project management methods which employed by fixed position layout in Malaysia |
title_sort |
survey of project management methods which employed by fixed position layout in malaysia |
publishDate |
2012 |
url |
http://umpir.ump.edu.my/id/eprint/3478/ http://umpir.ump.edu.my/id/eprint/3478/ http://umpir.ump.edu.my/id/eprint/3478/1/cd6277_85.pdf |
first_indexed |
2023-09-18T21:57:49Z |
last_indexed |
2023-09-18T21:57:49Z |
_version_ |
1777414197268709376 |