Najibah, A. (2012). The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn.
Chicago Style (17th ed.) CitationNajibah, Anuar. The Study on Implementation of Lean Production System in Front Disc D54T Line at Sapura Machining Corporation Sdn. 2012.
MLA (8th ed.) CitationNajibah, Anuar. The Study on Implementation of Lean Production System in Front Disc D54T Line at Sapura Machining Corporation Sdn. 2012.
Warning: These citations may not always be 100% accurate.