Planning and Design of a Knowledge Based System for Green Manufacturing Management
This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages. The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gaug...
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
IOP Publishing Ltd
2013
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/4161/ http://umpir.ump.edu.my/id/eprint/4161/ http://umpir.ump.edu.my/id/eprint/4161/1/P336.pdf |
id |
ump-4161 |
---|---|
recordtype |
eprints |
spelling |
ump-41612018-01-09T02:57:45Z http://umpir.ump.edu.my/id/eprint/4161/ Planning and Design of a Knowledge Based System for Green Manufacturing Management Mohd Kamal, Mohd Nawawi N. M. Zuki, N. M. Adam Shariff Adli, Aminuddin TJ Mechanical engineering and machinery This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages. The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites (GAP). The hybrid KB/GAP system identifies all potentials elements of green manufacturing management issues throughout the development of this system. The KB system used in the planning and design stages analyses the gap between the existing and the benchmark organizations for an effective implementation through the GAP analysis technique. The proposed KBGMM model at the design stage explores two components, namely Competitive Priority and Lean Environment modules. Through the simulated results, the KBGMM System has identified, for each modules and sub-module, the problem categories in a prioritized manner. The System finalized all the Bad Points (BP) that need to be improved to achieve benchmark implementation of GMM at the design stage. The System provides valuable decision making information for the planning and design a GMM in term of business organization. IOP Publishing Ltd 2013-07-01 Conference or Workshop Item PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/4161/1/P336.pdf Mohd Kamal, Mohd Nawawi and N. M. Zuki, N. M. and Adam Shariff Adli, Aminuddin (2013) Planning and Design of a Knowledge Based System for Green Manufacturing Management. In: IOP Conference Series: Materials Science and Engineering, 2nd International Conference on Mechanical Engineering Research (ICMER2013), 1-3 July 2013 , Kuantan, Pahang, Malaysia. pp. 1-9., 50 (1). ISBN 1757-8981 (print); 1757-899X (online) http://dx.doi.org/10.1088/1757-899X/50/1/012065 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
Universiti Malaysia Pahang |
building |
UMP Institutional Repository |
collection |
Online Access |
language |
English |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Mohd Kamal, Mohd Nawawi N. M. Zuki, N. M. Adam Shariff Adli, Aminuddin Planning and Design of a Knowledge Based System for Green Manufacturing Management |
description |
This paper presents a conceptual design approach to the development of a hybrid Knowledge Based (KB) system for Green Manufacturing Management (GMM) at the planning and design stages. The research concentrates on the GMM by using a hybrid KB system, which is a blend of KB system and Gauging Absences of Pre-requisites (GAP). The hybrid KB/GAP system identifies all potentials elements of green manufacturing management issues throughout the development of this system. The KB system used in the planning and design stages analyses the gap between the existing and the benchmark organizations for an effective implementation through the GAP analysis technique. The proposed KBGMM model at the design stage explores two components, namely Competitive Priority and Lean Environment modules. Through the simulated results, the KBGMM System has identified, for each modules and sub-module, the problem categories in a prioritized manner. The System finalized all the Bad Points (BP) that need to be improved to achieve benchmark implementation of GMM at the design stage. The System provides valuable decision making information for the planning and design a GMM in term of business organization. |
format |
Conference or Workshop Item |
author |
Mohd Kamal, Mohd Nawawi N. M. Zuki, N. M. Adam Shariff Adli, Aminuddin |
author_facet |
Mohd Kamal, Mohd Nawawi N. M. Zuki, N. M. Adam Shariff Adli, Aminuddin |
author_sort |
Mohd Kamal, Mohd Nawawi |
title |
Planning and Design of a Knowledge Based System for Green Manufacturing Management |
title_short |
Planning and Design of a Knowledge Based System for Green Manufacturing Management |
title_full |
Planning and Design of a Knowledge Based System for Green Manufacturing Management |
title_fullStr |
Planning and Design of a Knowledge Based System for Green Manufacturing Management |
title_full_unstemmed |
Planning and Design of a Knowledge Based System for Green Manufacturing Management |
title_sort |
planning and design of a knowledge based system for green manufacturing management |
publisher |
IOP Publishing Ltd |
publishDate |
2013 |
url |
http://umpir.ump.edu.my/id/eprint/4161/ http://umpir.ump.edu.my/id/eprint/4161/ http://umpir.ump.edu.my/id/eprint/4161/1/P336.pdf |
first_indexed |
2023-09-18T21:58:38Z |
last_indexed |
2023-09-18T21:58:38Z |
_version_ |
1777414248552464384 |