Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System

Technological developments in industrial innovations have currently been related to interconnected system assistance and distribution networks. This important in order to enable an electrical load to continue receive power in the event of disconnection of load from the main power grid. This pape...

Full description

Bibliographic Details
Main Authors: Abu Zaharin, Ahmad, Shalash, Nadheer A.
Format: Article
Language:English
Published: World Academy of Science, Engineering and Technology 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/5807/
http://umpir.ump.edu.my/id/eprint/5807/
http://umpir.ump.edu.my/id/eprint/5807/1/Reliability-Assessment-for-Tie-Line-Capacity-Assistance-of-Power-Systems-Based-On-Multi-Agent-System.pdf
id ump-5807
recordtype eprints
spelling ump-58072018-02-02T01:57:34Z http://umpir.ump.edu.my/id/eprint/5807/ Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System Abu Zaharin, Ahmad Shalash, Nadheer A. TK Electrical engineering. Electronics Nuclear engineering Technological developments in industrial innovations have currently been related to interconnected system assistance and distribution networks. This important in order to enable an electrical load to continue receive power in the event of disconnection of load from the main power grid. This paper represents a method for reliability assessment of interconnected power systems based. The multi-agent system consists of four agents. The first agent was the generator agent to using as connected the generator to the grid depending on the state of the reserve margin and the load demand. The second was a load agent is that located at the load. Meanwhile, the third is so-called "the reverse margin agent" that to limit the reserve margin between 0 - 25% depend on the load and the unit size generator. In the end, calculation reliability Agent can be calculate expected energy not supplied (EENS), loss of load expectation (LOLE) and the effecting of tie line capacity to determine the risk levels Roy Billinton Test System (RBTS) can use to evaluated the reliability indices by using the developed JADE package. The results estimated of the reliability interconnection power systems presented in this paper. The overall reliability of power system can be improved. Thus, the market becomes more concentrated against demand increasing and the generation units were operating in relation to reliability indices. World Academy of Science, Engineering and Technology 2014 Article PeerReviewed application/pdf en http://umpir.ump.edu.my/id/eprint/5807/1/Reliability-Assessment-for-Tie-Line-Capacity-Assistance-of-Power-Systems-Based-On-Multi-Agent-System.pdf Abu Zaharin, Ahmad and Shalash, Nadheer A. (2014) Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System. International Journal of Electrical, Electronic Science and Engineering, 8 (2). pp. 236-243. ISSN 9997398 http://waset.org/Publication/reliability-assessment-for-tie-line-capacity-assistance-of-power-systems-based-on-multi-agent-system/9997398
repository_type Digital Repository
institution_category Local University
institution Universiti Malaysia Pahang
building UMP Institutional Repository
collection Online Access
language English
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Abu Zaharin, Ahmad
Shalash, Nadheer A.
Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
description Technological developments in industrial innovations have currently been related to interconnected system assistance and distribution networks. This important in order to enable an electrical load to continue receive power in the event of disconnection of load from the main power grid. This paper represents a method for reliability assessment of interconnected power systems based. The multi-agent system consists of four agents. The first agent was the generator agent to using as connected the generator to the grid depending on the state of the reserve margin and the load demand. The second was a load agent is that located at the load. Meanwhile, the third is so-called "the reverse margin agent" that to limit the reserve margin between 0 - 25% depend on the load and the unit size generator. In the end, calculation reliability Agent can be calculate expected energy not supplied (EENS), loss of load expectation (LOLE) and the effecting of tie line capacity to determine the risk levels Roy Billinton Test System (RBTS) can use to evaluated the reliability indices by using the developed JADE package. The results estimated of the reliability interconnection power systems presented in this paper. The overall reliability of power system can be improved. Thus, the market becomes more concentrated against demand increasing and the generation units were operating in relation to reliability indices.
format Article
author Abu Zaharin, Ahmad
Shalash, Nadheer A.
author_facet Abu Zaharin, Ahmad
Shalash, Nadheer A.
author_sort Abu Zaharin, Ahmad
title Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title_short Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title_full Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title_fullStr Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title_full_unstemmed Reliability Assessment for Tie Line Capacity Assistance of Power Systems Based on Multi-Agent System
title_sort reliability assessment for tie line capacity assistance of power systems based on multi-agent system
publisher World Academy of Science, Engineering and Technology
publishDate 2014
url http://umpir.ump.edu.my/id/eprint/5807/
http://umpir.ump.edu.my/id/eprint/5807/
http://umpir.ump.edu.my/id/eprint/5807/1/Reliability-Assessment-for-Tie-Line-Capacity-Assistance-of-Power-Systems-Based-On-Multi-Agent-System.pdf
first_indexed 2023-09-18T22:01:12Z
last_indexed 2023-09-18T22:01:12Z
_version_ 1777414410383392768